Mitsubishi GOT MELSEC A985GOT-TBA-EU User Manual page 41

Table of Contents

Advertisement

c) For other cables between GOT and GOT
• Wind cable shield material around the cable, and pull out the
grounding braided wire of the cable shield material with the length
shown below.
• Do not pass the grounding braided wire on the programmable logic
controller through the core.
GOT side
130
(5.12)
Within 150
(5.90)
2) CPU Direct connection
a) For RS-232C cable (QC30R2)
• Peel the sheath (with the length shown below) at both ends of the
cable, and expose the shield braided wire for grounding. (For
grounding with cable clamps. (refer to Section 5.6.3.))
GOT side
130
(5.12)
Within 230
(9.06)
b) RS-422 cable (For AC30/100/300R4-25P)
(1) For A985GOT
• Wind cable shield material around the cable, and pull out the
grounding braided wire of the cable shield material with the
length shown below.
• Do not pass the braided wire for grounding through the
ZCAT2436-1330 ferrite core.
Ferrite Core
GOT side
(ZCAT2436-1330)
150
(5.90)
Ferrite Core
(ZCAT3035-1330)
Cable shield material
Grounding braided
wire(50mm(1.97inch))
Ferrite Core
(ZCAT3035-1330)
40
(1.57)
Ferrite Core
(ZCAT3035-1330)
Cable shield material
Grounding braided
wire(200mm(7.87inch))
30
130
(5.12)
Within 150
(5.90)
PLC side
130
(5.12)
40
Within 300
(11.81)
(1.57)
Ferrite Core
(ZCAT2436-1330)
150
(5.90)
GOT side
Unit : mm (inch)
Unit : mm (inch)
PLC side
Unit : mm (inch)

Advertisement

Table of Contents
loading

Table of Contents