2) Mounting position
When mounting the GOT, the following clearances must be left from the
other device.
Part A size: As the GOT connection cable is led out downward, the following
clearance must be provided in consideration of the bending radius.
A985/975/970GOT
A960GOT
When using a cable prepared by user, please consider the connector
cover to be used and the bending radius of the cable.
When using a bar code reader, please consider the dimensions of the
connector to be used and the bending radius of the cable.
Part B size: When using the PC card or audio output, a clearance of 100mm (3.94
inch) or more is required to lead out the cable and to mount or remove
the PC card. (A clearance of 50mm (1.97 inch) or more is required
when these are not used.)
Part C size: Please allow a gap 80mm (3.15inch) or more from the structure and
other equipment in the upper part of the unit to often allow good
ventilation.
Part D size: When installing a device that generates radiation noise (contactor,
etc.) or a device generating high levels of heat near the GOT, provide
a clearance of 100mm (3.94 inch) behind the module to avoid the
effect of the noise and heat.
3) Mounting method
a) Put the GOT main unit into the panel opening, with its front face first.
b) Mount the GOT in the following four locations at its top and bottom.
Mounting position
D
Other
device
Plate thickness
within 2 to 4mm (0.08 to 0.16inch)
Item
(Top)
20
C
B
B
A
A [mm] (inch)
130 (5.12) or more
140 (5.51) or more
(Bottom)
Mounting position