Shelf Installation; Lamps; Stocking - Hussmann VRM Installation & Operation Manual

Medium temperature self contained, glass door merchandiser with r-290 refrigerant
Table of Contents

Advertisement

SHELF INSTALLATION

After the cabinet is leveled, the shelves may be installed. Wire shelves
are adjustable. Shelf spacing can be adjusted by positioning the shelf
clips according to individual loading requirements.
VRM merchandisers have four movable wire shelves and one bottom
wire shelf, per door as a standard option. Extra shelves can be ordered
as an optional kit.

LAMPS

This merchandiser has a light switch inside, at the right side of the
plenum. The switch controls the display lighting and interior lighting.
Light Switch
Shelves
Bottom Shelf
HUSSMANN CORPORATION • U.S. & CANADA 1-800-922-1919 • BRIDGETON, MO 63044-2483 • MEXICO 1-800-890-2900 • WWW.HUSSMANN.COM • PN 3034041_ J

STOCKING

Product should NOT be placed in case until merchandiser is at proper
operating temperature. VRM merchandisers must remain in operation
for at least 24 hours before product may be loaded into case cabinet.
Proper rotation of product during stocking is necessary to prevent
product loss. Always bring the oldest product to the front and set the
newest to the back.
Air exhaust and return grille must remain open and free of obstruction
at all times.
Do not allow product, packages, signs, etc. to block air exhaust or
return grille. Do not use non-approved shelving, baskets, display racks,
or any accessory that could hamper air curtain performance.
Do not violate the load limit lines of VRM cases, because product will
block the cold air flow.
ATTENTION
Merchandiser must operate for 24 hours before loading
product!
Regularly check merchandiser temperatures.
Do not break the cold chain. Keep products in cooler before
loading into merchandiser.
These merchandisers are designed for only pre-chilled
products.
1-6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vrm1bVrm2bVrm3b

Table of Contents