Installing
1. Preparing for installation
Figure 6-6
– Place the adapter
– Place the clamping ring
– Expose and remove the outer cable jacket and sheath according to the device's geometry.
– Also expose a maximum of 18 mm from the cable outer jacket and the shielding
2. Installing:
Figure 6-7
– Insert the cone
– Slide the cable
– Slide the sheath
Figure 6-8
– Screw in the adapter
– Tighten the union nut
3. Connecting:
– Fasten the cable gland in the enclosure of the field control unit with a torque of around
– Cable installation / wiring in the enclosure of the field control unit: → Connecting the
Field device
Operating Instructions, 05/2022, A5E35640463-07
Cable: Preparing for installation
over the cable
Cable: Installation step 1
onto the male union
type of shielding. Ribbed side toward the braided shield.
through the male union
over the cone.
Cable: Installation steps 2 and 3
50 Nm.
OXYMAT 7 field module (Page 44).
.
over the cable
.
in the correct direction and according to the
.
.
.
Wiring
6.4 Field module cable
.