4.4.2 Ground Mounting
1) Plan the location in advance and choose a level surface.
Make sure the area is isolated from hazards that could
damage Pelio, such as vehicle traffic or flooding.
Consider the spacing requirements for Pelio.
2) Trace two screw holes on the ground and drill two screw
holes at marked positions.
30