13.4 New installation, Relocation, Repairing of Refrigerant Cycle System The
Procedures
New
Installation
Evacuation (Air purging) new installation and relocation for at or
more than 15 minutes, re-charging at or more than 60 minutes
Relocation
Pump down
• Displacing pipes and wires, and displacing indoor / outdoor units
Prevention of impurity
Removal
・Indoor / outdoor units installation and piping, and wiring
Leakage checking
Repairing refrigerant cycle
Indoor / outdoor units and piping
• Dismantling indoor / outdoor units
• Repairing by brazing
Operation testing
119
Refrigerant recovery
Insertion of refrigerant