Unigas E115X Installation Manual page 20

Table of Contents

Advertisement

Siemens VGD20.. e VGD40..
Componenti e posizione dei pressostati
SKP25
SKP15
5
4
7
3
Collegamento attuatore SKP2... alla rampa gas
min. 5 Ø
Siemens SKP2.. (pressure governor)
- Connect the reference gas pipe (TP in figure; 8mm-external size pipe supplied loose), to the gas pressure nipples placed on the gas
pipe, downstream the gas valves: gas pressure must be measured at a distance that must be at least 5 times the pipe size.
- Leave the blowhole free (SA in figure). Should the spring fitted not permit satisfactory regulation, ask one of our service centres for a
suitable replacement.
- D: sede della molla di regolazione pressione.
WARNING: removing the four screws BS causes the device to be unserviceable!
version with SKP2 (built-in pressure stabilizer)Siemens VGD../VRD.. SKPx5 (Auxiliary-optional micro
switch)Gas valve
Se necessario il microinterruttore ausiliario (POC) deve essere ordinato un attuatore dedicato, diverso da quello solitamente fornito. Il
collegamento è mostrato in figura.
Valve
AG
drive
A64
SKP25
6
5
4
2
1
8
Ø
Valve
drive
A65
PART III: INSTALLATION
1
PGMIN pressostato gas di minima
2
PGMIN pressostato gas di minima (alternativo a 1)
SKP15
6
3
PGCP pressostato gas controllo perdite
4
PGMAX pressostato gas di massima
3
5
Azionatore con stabilizzatore di pressione incorpo-
2
rato
6
Azionatore On-Off
7
Corpo valvola (Filettata)
8
Corpo valvola (Flangiata)
1
Plug connection
AG
Plug connection
20
TP
BS
D
SKP2
AGA64 -
Valve drive
ON-OFF
End of stroke
End of stroke
(POC)
SA

Advertisement

Table of Contents
loading

This manual is also suitable for:

E150xE180x

Table of Contents