Unigas E115X Installation Manual page 15

Table of Contents

Advertisement

A
Fitting the burner to the boiler
To install the burner into the boiler, proceed as follows:
make a hole on the closing door of the combustion chamber as described on paragraph "Overall dimensions")
place the burner to the boiler: lift it up and handle it according to the procedure described on paragraph "Handling the burner";
place the 4 stud bolts (5), according to the burner's drilling plate described on paragraph "Overall dimensions";
fasten the 4 stud bolts;
place the ceramic fibre plait on the burner flange;
install the burner into the boiler;
fix the burner to the stud bolts, by means of the fixing nuts, according to the next picture.
After fitting the burner to the boiler, ensure that the gap between the blast tube and the refractory lining is sealed with appropriate insu-
lating material (ceramic fibre cord or refractory cement).
4
The burner is designed to work positioned according to the picture below. For different installations, please contact the Manufacture.
PART III: INSTALLATION
Eyebolts
Ø 12 mm
6
5
4
3
2
1
6
Keys
1 Burner
2 Fixing nut
3 Washer
7
4 Ceramic fibre plait
5 Stud bolt
7 Blast tube
15
1
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

E150xE180x

Table of Contents