Pre-Installation Checklist

The owner should use the checklist below to prepare for the installation of their pelletizer. It
is the owner's responsibility to verify all the necessary preparations have been made to the
installation site and meet the specifications and guidelines detailed in this publication.
Check off each item in the checklist as pre-installation preparations are completed. Once the
checklist is complete, the owner or responsible party will sign and date the Pre-Installation
Confirmation form and return it to Cold Jet.
Completed Task
The installation site of the pelletizer is indoors, well-ventilated, with sufficient
clearances on all sides (including the top).
The installation of the CO
owner-selected CO
The supply pipeline has been installed and meets the specifications described in
"Liquid CO
The exhaust pipeline has been installed and meets the specifications described
in "Gas CO2 Exhaust System" on page 9.
The electrical connections are in compliance with the regional specifications
described in "Electrical Service & Supply" on page 10.
The instrument air or CO
been installed and meets the specifications described in "Instrument Process Air
Supply" on page 10.
The appropriate type and amount of hydraulic oil is on site and available for use
in the pelletizer's hydraulic oil tank.
Internet connection for remote technical support.
Pre-Installation Conformation Form
I hereby verify the pre-installation preparations listed above have been completed.
Customer: ___________________________________________________________________________________________
Order: _______________________________________________________________________________________________
Owner/Contact: _____________________________________________________________________________________
Signature ____________________________________________________________________________________________
Date: _________________________________________________________________________________________________
Notes/Remarks to Cold Jet: _________________________________________________________________________
Email the signed form to the to the Cold Jet project lead named on the front page
supply tank is complete and has been filled by the
2
supplier (refer to "Liquid CO
2
Supply System" on page 8.
2
gas supply for the pelletizer's pneumatic system has
2
Pre-Installation Guidelines & Checklist
Supply System" on page 8).
2
21

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PR350H and is the answer not in the manual?

This manual is also suitable for:

Pr120hPr750h

Table of Contents