5 Run the link cables through the
conduit into the sleeve chamber
(using a draw wire if necessary).
6 If possible, test the connections
before the final surface is laid.
7 Prior to surfacing, replace the
supplied pour cover onto the
sleeve to prevent concrete
entering the chamber. Tape over
the holes in the pour cover.
www.acclaimlighting.com
9