About This Guide
Purpose
This guide provides instructions to correctly install, commission and operate Eaton Core
Power Solutions (CPS) (DV2-C16 Models).
Audience
This guide is intended for use by:
Installers competent in:
•
installing and commissioning dc power systems
•
safe working practices for ac and dc powered equipment
•
the relevant local electrical safety regulations and wiring standards
•
Operators and maintenance staff competent in:
•
operation of dc power systems
•
safe working practices for ac and dc powered equipment
•
Scope
This guide covers installation, commissioning, operation and maintenance of Eaton Core
Power Solutions.
It does not cover:
System controller operations; installation of external alarm and user digital inputs
•
cabling; or setup of communications options or software. For details refer to the system
controller operation handbook listed under Related Information on page i.
Installation and configuration of Eaton SiteSure and CellSure modules. For details, refer
•
to the relevant guide listed under Related Information on page i.
Related Information
PowerManagerII Online Help
•
DCTools Online Help
•
SC200 System Controller Operation Handbook – IPN 997-00012-50
•
SiteSure-3G Installation and Operation Guide – IPN 997-00012-51
•
CellSure Installation Guide – IPN 997-00012-20
•
Reporting Problems with this Guide
Please use this email address to report any problems you find in this guide:
Eaton DC Product Marketing Communications
EMAIL:
DCMarketingNZ@eaton.com
Copyright © 2008-2009 Eaton Corporation. All Rights Reserved.
IPN 997-00012-71B
About This Guide
July 2009
i