M 2 1 5 Q U I C K I N S T A L L G U I D E
Installing the M215 Microinverter
(M215-60-2LL-S22-IG / S23-IG / S24-IG)
The M215 meets the requirements of NEC 690.35. Because the DC circuit is isolated and insulated from ground, the
M215 does not require that you install a GEC between microinverters. Ground fault protection (GFP) is integrated into the
microinverter. To support this feature, the PV module must be equipped with DC cables labeled "PV Wire" or "PV Cable."
Register the System
1
Register the System at the Enlighten website:
https://enlighten.enphaseenergy.com.
a. Log in to Enlighten
At the installer dashboard, click Add a New
System.
b. Enter System Activation Information
Enter the System, Installer, Owner, and
Location information.
Enter the Envoy serial number.
The serial number label is on the back
of the Envoy, near the left mounting bracket.
c. Select the Grid Profile (if required)
In the continental US, you can skip this step
because the factory settings meet requirements.
If you have selected a country other than the US,
or if you select Hawaii as the state under Location,
the Grid Profile menu appears.
Select the appropriate profile from the Grid
Profile menu.
Click Save to submit the form.
For more information on Grid Profiles, refer to the
Envoy Communications Gateway Installation and
Operation Manual at:
http://www.enphase.com/support.
System Activation form
®