Download Print this page

enphase M215 Instructions Manual page 4

Hide thumbs Also See for M215:

Advertisement

Connect the Envoy
2
a. Connect the Envoy to power and Internet according to the Envoy Quick Install Guide.
b. Look for the + Web indication on the LCD screen.
c. Leave the Envoy running while you install the microinverters
so that any required Envoy software upgrade completes.
Warning: Do not remove power from
the Envoy if the LCD displays:
"Upgrading. . . Do Not Unplug."
Position the Enphase Engage™ Cable
3
a. Plan the cable length to allow drop connectors on the Engage Cable align to with each
PV module. Allow extra length for slack, cable turns and any obstructions.
b. Cut a length of Engage Cable to meet your planned needs.
c. Lay out the cabling along the installed racking for the AC branch circuit.
Install an AC Junction Box
4
a. Install an appropriately rated, off-the-shelf junction box
at a suitable location on the racking.
b. Provide an AC connection from the AC junction box
back to the electricity network connection using equip-
ment and practices as required by local jurisdictions.
See notes in Step Details.
AC junction
box
Communications Gateway™
®
connects to drop
connector
M215
DC connectors
You must use 240 VAC cable for single-phase
Envoy
terminator
drop
connector
cable ties
Check the drop connector labels to
be sure that you have the right cable.
or 208 VAC cable for three-phase.
broadband
router
Engage
Cable

Advertisement

loading

This manual is also suitable for:

M215-60-2ll-s22-igM215-60-2ll-s23-igM215-60-2ll-s24-ig