Powering The Server - Emerson VERDANT VX Series Installation Manual

Wired energy management thermostat with an occupancy sensor
Table of Contents

Advertisement

Network Installation
Powering on the Server
Plug the Server into an electrical outlet with the supplied power cord.
TO PREVENT POWER RELATED ISSUES, PLUG THE SERVER INTO A UPS
(UNINTERRUPTED POWER SUPPLY) UNIT.
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Verdant vx-tr-kt

Table of Contents