Download Print this page

TMG -GH2030BL Product Manual page 8

2030walk-in tunnel greenhouse

Advertisement

Step 2 : Assemble all trusses
The building includes 7 trusses : (1) front truss, (1) rear truss, and (5) middle trusses.
The front and the rear truss are to install with the fabric panel (#23 and #23A).
Parts used to install the front truss in this step (refer to Figure 2) :
-
-
-
-
-
-
Parts used to install the rear truss in this step (refer to Figure 3) :
-
-
-
-
-
-
-
-
(1) Peak arch tube (#1)
(2) Upper rafter tube (#2A)
(2) Shoulder tube (#3)
(2) Lower rafter tube (#4)
(10) Hex bolt (#17)
(2) Hex bolt (#19A)
(1) Peak arch tube (#1)
(2) Upper rafter tube (#2)
(2) Shoulder tube (#3)
(2) Lower rafter tube (#4)
(1) Ceiling cross bar (#11)
(10) Hex bolt (#17)
(2) Hex bolt (#19)
(2) Hex bolt (#19A)
Figure 2
16
Page 7 of

Advertisement

loading