TMG -GHD3060 Product Manual

30x60 ft light deprivation tunnel greenhouse

Advertisement

Quick Links

▶ W W W . T M G I N D U S T R I A L . C O M
P 0 / 2 0
T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9

Advertisement

loading

Summary of Contents for TMG TMG-GHD3060

  • Page 1 ▶ W W W . T M G I N D U S T R I A L . C O M P 0 / 2 0 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 2: Main Specifications

    Main specifications  Assembly size : W9.15 x L18.2 x H3.66 (m) / W30 x L60 x H12 (ft)  Shoulder height : H1.6 (m) / 5ft  Door : W2.2 x H2 (m) / 7.2 x 6.6 (ft) Prior to assembly Please read the instructions carefully before installation.
  • Page 3 TMG-GHD3060 Part List Part Graphical Description Length code φ58xL1370mm Peak arch tube φ58xL1780mm Upper rafter tube Upper rafter tube φ58xL1780mm (front and rear trusses) φ58xL1990mm Lower rafter tube Lower rafter tube φ58xL1990mm (front and rear trusses) φ58xL1956mm Shoulder tube Shoulder tube φ58xL1956mm...
  • Page 4 Door right lower vertical L1487mm tubes Door right upper vertical L1682mm tubes Connector tube L120mm φ42xL1552mm Door cross tubes Door cross tubes L1689mm Door frame cross pull L2154mm tube φ42xL1987mm Ceiling cross bar L1978mm Door frame column tube Door frame column left L1978mm tube Door frame column...
  • Page 5 φ25xL820mm Roll film tube Roll film tube L1995mm Roll film tube L550mm Connecting rod L100mm Door buckle L150mm Film rolling machine L220mm Film rolling machine L200mm Eight clip spring L120mm Pressure film carrier L80mm Half round head bolt M6x50mm Self locking bolt M10x80mm and nuts Self locking bolt...
  • Page 6 Half round head bolt M6x12mm Self tapping screw #12x35mm Square plug W30mm φ25mm Round plug φ8xL200m Braided rope Top cover film W14.5xL19m Front and rear door W4.5xL9.5m film(black and white film) Top cover film W7.3xL19m (black and white film) Adhesive tape (10m) Socket wrench (8mm)
  • Page 7 Installation steps Step 1 : Review the whole structure and choose the proper installation site. Mark the ground in the final building location with a line showing the positions of base plates, front doors. All lines should be drawn from center to center of all base plate tubes. Diagonal line X must be equal to Y.
  • Page 8 Step 2 : Assemble all trusses.  Install front and rear trusses. Part Part 12x2 ▶ W W W . T M G I N D U S T R I A L . C O M P 7 / 2 0 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 9  Install (13) middle trusses. Part Part 1x13 1x13 2x13 12x13 2x13 2x13 2x13 ▶ W W W . T M G I N D U S T R I A L . C O M P 8 / 2 0 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 10  Lay down all (15) trusses on the ground when the assembly is all completed and before moving to next step, and then wrap (#33) around the sharp points of the joint to avoid friction between the fabric and the interface, resulting in fabric damage.
  • Page 11 Step 3 : Put up all trusses.  Put up the truss, use hex bolt (#23) to secure the truss to the base plates.  Connect all purlins, and then wrap (#33) around the sharp points. Part Part ▶ W W W . T M G I N D U S T R I A L . C O M P 1 0 / 2 0 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 12 Step 4 : Install front and rear trusses. Part Part 16x2 16x2 ▶ W W W . T M G I N D U S T R I A L . C O M P 1 1 / 2 0 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 13 Step 5 : Install boards (#36) and reed groove (#14). Part Part ▶ W W W . T M G I N D U S T R I A L . C O M P 1 2 / 2 0 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 14 Step 6 : Install front and rear film.  Lift the film (#32A) and fix the film with a clip spring (#14A) from top to bottom.  Cut the door film as shown. Part Part 24x2 24x2 ▶ W W W . T M G I N D U S T R I A L . C O M P 1 3 / 2 0 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 15 Step 7: Install top cover film.  When you are ready to install the roof cover, unpack the cover and position it parallel to the building frame on one side. the cover must be pulled over the top of the truss frame without being snagged or stressed on any frame members. tighten the film evenly to eliminate wrinkles and make the film flat and smooth.
  • Page 16  Install black and white film. Part ▶ W W W . T M G I N D U S T R I A L . C O M P 1 5 / 2 0 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 17  Continue to install the inner film. Part ▶ W W W . T M G I N D U S T R I A L . C O M P 1 6 / 2 0 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 18 Step 8 : Install roll film system.  Install the roll film tube(#16,#16A) and (#16B,#16C), add a round plug (#30) at the end. the film (#32) is wound on a roll film tube (#16,#16A), the film (#32B) is wound on a roll film tube (#16B,#16C), and clamped with a pressure film carrier (#20).
  • Page 19  A round plug (#30) is put on both ends of the film rolling machine guide tube (#15A,#16), and the guide tube is mounted on the support with a hex bolt (#26A), and it is required to swing freely. The film rolling machine (#18A) drives the roll film tube (#16C,#16D) to be raised and lowered horizontally and flexibly without jamming.
  • Page 20  A round plug (#30) is put on both ends of the film rolling machine guide tube (#15), and the guide tube is mounted on the frame with a hex bolt (#26), and it is required to swing freely. The film rolling machine (#18) drives the roll film tube (#16,#16A) to be raised and lowered horizontally and flexibly without jamming.
  • Page 21 After the Installation Walk around and inspect the tunnel greenhouse periodically to make sure all components are still firmly secured and the whole shelter is well supported. Check all bolts and nuts as well as all connection points to make sure they are all in good position. We strongly recommend you remove any snow from the roof immediately.