Main specifications Overall assembled size : W7.62 x L29.9 x H3 (m) / W25 x L98 x H10 (ft) Shoulder height : H1.2 (m) / 4ft Door : W1.2 x H2 (m) / 4 x 6.6 (ft) Prior to assembly Please read the instructions carefully before installation.
Page 3
TMG-GH25100 Part List Parts Graphical Description code Peak arch tube Upper rafter tube Shoulder tube Shoulder tube (front and rear truss) Roof purlin (horizontal tube) Base plate Expansion bolt M12x100mm Door column base plate Vertical tubes Door left vertical tubes...
Page 4
Ceiling cross bar Tube clamp Film rolling machine guide tube Roll film tube Roll film tube Door buckle Film rolling machine Reed groove Clip spring Eight clip spring Pressure film carrier Half round head bolt M6x50 Self locking bolt M10x70mm and nuts Hex bolt M10x70mm and nuts Hex bolt...
Page 5
Self tapping screw #12x25 Self tapping screw #12x35 Square plug Round plug(φ25) 1 bundle Braided rope (100m) Top cover film Front and rear door film Adhesive tape Socket wrench Hex wrench Board 150x15x2000mm (not included) Installation steps Step 1 : Review the whole structure and choose the proper installation site ...
Page 6
Be aware of the surrounding area. Do not set up the building near snowdrifts, open flames or exposed electrical wires. Do not keep heat sources near the fabric cover. Keep the building surroundings clear at all times Mark the ground in the final building location with a line showing the positions of base plates, front doors.
Page 7
(1x2) Peak arch tube (#1) (2x2) Upper rafter tube (#2) (2x2) Shoulder tube (#3A) (1x2) Ceiling cross bar (#11) (8x2) Hex bolt (#22) (2x2) Hex bolt (#23) Figure 2 Parts used to install (22) middle trusses in this step (refer to figure 3) : (1x22) Peak arch tube (#1) (2x22) Upper rafter tube (#2) (2x22) Shoulder tube (#3)
Page 8
Lay down all (24) trusses on the ground as figure 4 when the assembly is all completed and before moving to next step. Figure 4 Step 3 : Put up all trusses (refer to figure 5) Put up the front truss, use hex bolt (#22) to secure the truss to the base plates. ...
Page 9
Repeat above step to put up all other trusses (from 2th to 24th truss), and connect all purlin. Now the whole structure is completely up. (refer to figure Parts used in this step : (7x23) Roof purlin (#4) (7x24) Self locking bolt (#21) (4x23) Hex bolt (#22) Figure 6...
Page 10
Figure 7 The whole structure inspection: check all components and trusses to make sure the whole structure is squared to the base line drawn at the step 1. All trusses must be set up righted at 90 degree. All purlin must be straight in line. If any purlin are not in line with they will need to be corrected before moving to the next step.
Page 11
Figure 8 Step 6 : Install front and rear cover panel (refer to figure 9) Lift the film (#30A) and fix the film with a clip spring (#17A) from top to bottom. Install door buckle (#15) with self tapping screw (#25). ...
Page 12
Figure 9 Step 7 : Install the film and roll film system (refer to figure 10) NOTE : The cover must be installed on a windless day. DO NOT attempt to install the cover during windy conditions. when you are ready to install the roof cover, unpack the cover and position it parallel to the building frame on one side.
Page 13
Parts used in this step : (2) Film rolling machine guide tube (#13) (30) Roll film tube (#14) (2) Roll film tube (#14A) (2) Film rolling machine (#16) (60) Clip spring (#17A) (94) Eight clip spring (#18) (48) Pressure film carrier (#19) (2) Hex bolt (#24) (60) Self tapping screw (#25) (6) Round plug (#28)