Download Print this page

TMG -GH2030BL Product Manual page 7

2030walk-in tunnel greenhouse

Advertisement

Mark the ground in the final building location with a line showing the positions of
base plates, front, and rear doors. All lines should be drawn from center to center of
all baseplate tubes. Diagonal line X must be equal to Y.
Baseplates: all baseplates must be installed firmly with expansion bolts (#16) on this
step (refer to Figure 1).
Parts used in this step :
(4) Baseplate (#5L,#5R)
-
(10) Baseplate (#7)
-
(2) Baseplate (#6)
-
(50) Expansion bolt (#16)
-
(2) Baseplate (#6A)
-
Figure 1
16
Page 6 of

Advertisement

loading