Download Print this page

TMG -GH2030BL Product Manual page 16

2030walk-in tunnel greenhouse

Advertisement

Step 9 : Install rear cover panel
Use rope (#24) to lift up the rear cover (#23A) from the center grommet and tie it
firmly to the truss tube and spread toward both sides through each grommet along the
tube (refer to Figure 14).
Step 10 : Install the top cover (#22)
Do not install the cover during windy weather!
Unpack the top cover and place it along one of the long sides of the structure.
Use 3 to 5 ropes (#24) to pull the cover over the top of the structure, 2 or 3
people standing inside on ladders to push upwards will help to move the cover
smooth without any damage (refer to Figure 15).
Figure 14
Figure 15
16
Page 15 of

Advertisement

loading