IBM Elastic Storage System 3200 Hardware Planning And Installation Manual page 69

Hide thumbs Also See for Elastic Storage System 3200:
Table of Contents

Advertisement

e) Secure the rear end of the left outer rail to the rack using the M5 shipping screw that comes with
the supplier rail kit.
Figure 24. Securing the rear end of the left outer rail
f) Remove the middle screw (as shown in the following figure) from the front end of the left outer rail
using a flat tip screwdriver.
Figure 25. Removal of the middle screw
g) Push and hold the release catch outward and insert the left front bracket mounting screws into the
left front rack post holes. Verify that the rail is level.
Before
Release
Catch
Figure 26. Installation of the front bracket
h) Once the mounting screws are fully inserted into the rack post holes, release the catch to secure
the rail to the post.
i) Install the middle screw on the front end of the left outer rail as shown in the following figure.
After
Chapter 4. Installing  51

Advertisement

Table of Contents
loading

Table of Contents