Shifting; Placing The Load; Storage; Unpacking - Electrolux ELAI3 Series Installation Manual

Under counter dishwasher
Hide thumbs Also See for ELAI3 Series:
Table of Contents

Advertisement

For correct and safe lifting operations:
• use the type of equipment most suitable for characteristics
and capacity (e.g. electric pallet truck or lift truck);
• cover sharp edges;
• check the forks and lifting procedures according to the
instructions given on the packing.
E.3.2

Shifting

The operator must:
• have a general view of the path to be followed;
• stop the manoeuvre in case of hazardous situations.
E.3.3

Placing the load

• Before placing the load, make sure the way is free and that
the floor is flat and can take the load.
• Remove the appliance from the wooden pallet, move it to
one side, then slide it onto the floor.
E.4

Storage

The appliance and/or its parts must be stored and protected
from damp, in a non-aggressive place, free of vibrations and
with room temperatures between -10℃ [14℉] and 50℃
[122℉].
The place where the appliance is stored must have a flat
support surface to avoid deforming the appliance or damage to
the support feet.
F
INSTALLATION AND ASSEMBLY
WARNING
Refer to "Safety Information".
F.1

Introduction

To ensure correct operation of the appliance and maintain safe
conditions during use, carefully follow the instructions given
below in this section.
F.2

Customer responsibilities

The Customer must provide for the following:
• installation of an adequate electrical power supply ahead of
the appliance, according to the equipment's technical
specifications (D TECHNICAL DATA and D.4 Character-
istics of power supply);
• the equipotential connection
system to the metal structure of the machine by means of a
copper cable of adequate section (see position "EQ" in
Installation diagram);
• adducting for the electrical connection between the work-
place electric panel and the equipment;
• the water supply and drain connections and other con-
nections as indicated in D TECHNICAL DATA and in the
paragraph F.6 Plumbing connections;
F.3

Characteristics of the installation place

The machine is designed for installation in professional and
not domestic-type kitchens. Water collection traps/ metal
grates must be arranged in the floor at the machine discharges
(see the Installation diagram), possibly replaceable with a
single water trap sized for a flow rate of at least 3 l/s.
F.4

Positioning

The machine must be taken to the place of installation and the
packing base removed only when being installed.
of the workplace electrical
CAUTION
Do not make modifications to the parts
supplied with the appliance. Any missing
or faulty parts must be replaced with
original parts.
E.5

Unpacking

IMPORTANT
Immediately check for any damage caused during
transport.
Inspect the packaging before and after unloading.
1. Remove the packaging.
Take care when unpacking and handling of the appliance
to not cause any shocks on itself.
2. Keep all the documentation contained in the packaging.
Note
• The forwarder is responsible for the goods during transport
and delivery.
• Make a complaint to the forwarder in case of visible or
hidden damage.
• Specify any damage or shortages on the dispatch note.
• The driver must sign the dispatch note: the forwarder can
reject the claim if the dispatch note is not signed (the
forwarder can provide the necessary form).
• For hidden damage or shortages becoming apparent only
after unpacking, request the forwarder for inspection of the
goods within and no later than 15 days after delivery.
Arranging the machine:
• Wear protective gloves and unpack the machine.
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents