Connecting The Blowback Trigger - Ametek LAND MILLWATCH User Manual

Table of Contents

Advertisement

Millwatch / Silowatch

10 Connecting the Blowback Trigger

Connect the blowback unit to Conn 21.
Service
1
Blowback trigger
14
Requirement
CONN 21 Pin 1 (0 V dc)
CONN 21 Pin 2 (24 V dc)
Single Stream
Size/Specification
Blowback unit Pin 1
Blowback unit Pin 2
User Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Land silowatch

Table of Contents