Single Stream
7

Recommended Installation for Probe

Position the analyser and probe below the blowback unit to allow any condensate to
drain.
7.1 Recommendations for Installing the Instrument Air Supply and
Calibration Gas
Millwatch / Silowatch (CO single stream, including high-CO) only
*A 30 psi pressure regulator is supplied in the spares kit with the monitor and must
be fitted by the user. All other pressure regulators and pipework must be supplied
by the customer.
User Guide
Millwatch / Silowatch
1
Cooling air supply
2*
Calibration air supply
3
Compressed air supply
4
Mill/Silowatch Detector
5
Calibration gas (CO), 2
stage non-relieving pressure
regulator
9