Emerson Rosemount 3814 Instruction Manual page 36

Liquid ultrasonic flow meter
Hide thumbs Also See for Rosemount 3814:
Table of Contents

Advertisement

Mechanical Installation
January 2023
10. NEVER apply shock loads to the meter. Always lift the meter gradually. If
11. NEVER lift with any device, such as hooks, chains, or cables that could create
12. NEVER lift more than the ultrasonic meter assembly including electronics
13. Remove the hoist rings from the meter after lifting is completed and store
36
Figure 2-9: Incorrect sling attachment
shock loading ever occurs, the hoist ring must be inspected per
manufacturer's recommendations prior to be placed in any further service.
If a proper inspection cannot be performed, discard the hoist ring.
side pulls that could damage the ring of the hoist ring.
and transducers with the hoist rings. The only exception is that it is safe to
lift the meter with one ASME B16.5 or ASME B16.47 blind flange bolted to
each end flange of the meter. NEVER use the hoist rings on the meter to lift
other components such as meter tubes, piping or fittings attached to the
meter. Doing so will exceed the load rating of the hoist rings.
them in an appropriate case or container per their manufacturer's
recommendation.