Download Print this page
Emerson ROSEMOUNT370XA Quick Start Manual
Emerson ROSEMOUNT370XA Quick Start Manual

Emerson ROSEMOUNT370XA Quick Start Manual

Danalyzer gas chromatograph

Advertisement

Quick Links

Danalyzer 370XA Gas Chromatograph
Quick Start Guide

Advertisement

loading

Summary of Contents for Emerson ROSEMOUNT370XA

  • Page 1 Danalyzer 370XA Gas Chromatograph Quick Start Guide...
  • Page 2 Typical Installation 370XA Gas Chromatograph Sample handling system Pole mount brackets Atmospheric vent 4-inch Pole Natural gas pipeline Carrier gas - Ultra-High Purity (99.9995 %) Helium (or optional Hydrogen) Calibration gas ¼ inch stainless steel tubing Carrier gas switchover valves ⅛...
  • Page 3 Minimum Specifications Safety First. Before You Start… These are the minimum specifications recommended for a typical This quick start guide is intended for typical installations only. installation. Please reference the 370XA product manual for more For more details, please reference the 370XA product manual or details or call the factory for additional support.
  • Page 4 Step 1- Mounting the 370XA Recommended Minimum Installation Clearances 665 mm (38 in) 50 mm (2 in) 635 mm 280 mm (25 in) (11 in) 200 mm (8 in) 460 mm (18 in) 1660 mm (65 in) 200 mm 305 mm 200 mm (8 in) (12 in)
  • Page 5 Mount the bracket on the wall. Maneuver the GC to insert the two top bolts into the eyelets of the mounting bracket and allow the bolts to drop down and hold the GC loosely on the bracket. 140 mm (5½ in) 275 mm (10⅞...
  • Page 6 Step 2 – Sample Handling System and Gas Line Connections Mount the single stream sample plate Use the two one-inch bolts and a 5/32 hex wrench to screw the Use the two half-inch bolts and a 5/32 hex wrench to screw the large mounting bar tightly to the left side of the plate with the small mounting bar loosely to the right side of the plate with angled foot facing the edge of the plate.
  • Page 7 Connect the gas lines Using the tubing supplied with the sample system, connect the stream, actuation, and calibration gases from the sample plate to the manifold block (as shown). Stream 1 Calibration Carrier/Actuation Stream 1 Carrier Calibration Actuation Connect the atmospheric vents to a vent line of at least ⅜'' diameter that is routed to the atmosphere in a safe area to ensure there is no back-pressure created on the vents.
  • Page 8 Step 3 – Wiring 1. Route the power supply lines through the lower left or right cable entry – which ever is the most convenient. 2. Connect power wires to TB8. DO NOT APPLY POWER YET. 3. Route the communication wiring through the lower right cable entry. If additional separation of wiring is required, use the upper right cable entry for the additional signal wiring.
  • Page 9 Step 4 – Start up Turn on the power. The local operator interface (LOI) will show the Emerson logo while the software starts up, and then it will show the home screen. Local Operator Interface FULL COLOR SCREEN 480 x 272 pixels...
  • Page 10 The Home Screen. Note: The Login screen will appear if you are not logged in. Enter your user name and password. The default values for 370XA GCs is: User: EMERSON Password: (blank) Configure the Time and Date 1. From the main menu, select Set GC Time from the Tools menu.
  • Page 11 3. Press the key to continue, and enter in the Uncertainty values from the certificate. NOTE: If the calibration certificate does not include uncertainty values, use the default 2 % setting. 4. Press the key to continue, and enter the energy value for the calibration blend. NOTE: The calculated value shown on the display is calculated using the same C6+ Ratio of C6/C7/C8 as is used in the stream calculations.
  • Page 12 ©2014 Emerson Process Management. All rights reserved. The Emerson logo is a trademark and service mark of Emerson Electric Co. Rosemount Analytical is a mark of one of the Emerson Process Management family of companies. All other marks are the property of their respective owners.