Commissioning

4. Commissioning
This chapter outlines the initial setup of the machine.

4.1. Initial commissioning

It is imperative to read the General Safety Instructions (page 8) and understand this
manual before commissioning the machine. In case of unclear information, please
contact your local service organisation.
Specifications for the electrical connection and the standards quoted apply for
connecting the machine in EU countries. It may be necessary to also observe
additional country specific regulations. Outside the EU, acceptance of the standards
quoted is to be checked by the legal entity or person who wishes to use the machine.
The machine weighs > 20 kg, two people are required to unpack, transport and/or lift
it onto a flat stable table capable of bearing its weight.
Remove the access panel before lifting.
If using a forklift, hand stacker or any other manual lifting equipment, make sure to
use it according to local regulations.
Your service organisation will put your machine in operation for the first time and
instruct you on its operation.
Subsequent recommissioning, decommissioning or any service and repair operations
will also be undertaken by your service organisation.

4.2. Requirement prior to initial commissioning

A few preparations are necessary before your service engineer can set up your machine. The following
preparations must be carried out by a professionally qualified person.
02.01.2023
Page 41 of 150
© Eversys S.A.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Cameo C'2c/Classic and is the answer not in the manual?

Table of Contents

Save PDF