Installing the Switch
Installation Procedures
2-5

1. Prepare the Installation Site

Cabling Infrastructure - Ensure the cabling infrastructure meets the
necessary network specifications. See appendix A,
Technology Information Specifications"
Installation Location - Before installing the switch, plan its location and
orientation relative to other devices and equipment:
On the back of the switch, leave at least 7.6 cm (3 inches) of space for
the twisted-pair cabling.
On the back of the switch, leave at least 3.8 cm (1 1/2 inches) of space
for the power cord.
On the sides of the switch, leave at least 7.6 cm (3 inches) for cooling.
"Cabling and
for more information: