Download Print this page

Dometic 9000 Series Installation Manual page 13

Sanitation toilets

Advertisement

Marking the locations (applicable to both methods)
➤ Position the bowl in the designated toilet location.
➤ Confirm that adequate clearance exists for the seat and lid to open freely and (for 9300 series
only) the flush handle to operate easily on the left side of the toilet.
➤ Mark the rear corners of the bowl and set the bowl aside.
➤ Measure the distance between the two rear corner marks and divide the measurement in half
to identify the primary centerline location.
➤ Draw the primary centerline a minimum of 14" long.
If using the through-the-wall method, also mark the horizontal primary centerline.
➤ Mark the center of the discharge flange access hole.
➤ Mark the center of the upper rim water supply line and electrical wires access hole.
➤ Draw the secondary centerline a minimum of 4" long.
➤ Mark the center of the lower bowl water supply line access hole.
➤ Drill the discharge flange access hole.
➤ Drill the upper rim water supply line and electrical wires access hole.
➤ Drill the lower bowl water supply line access hole.
13
Toilets
EN

Advertisement

loading

This manual is also suitable for:

930094009500