Download Print this page

Dometic 9000 Series Installation Manual page 11

Sanitation toilets

Advertisement

5.2
Planning the electrical connections (Models 9400 and 9500)
I
Plan the switch/status panel location, if applicable, so that the wiring cable and
connections are installed in locations that always remain dry. Use the length of the
provided wiring cable to help space the electrical connections at the proper distance
from the toilet.
11
Wall
➤ Place the wall switch template in the
desired location.
➤ Mark the location of the fastener and
access holes.
5.3
Identifying centerline and access hole locations
Through-the-floor method
(Below-Finished Floor Level Installation)
13
China Toilet
Base-Rear
3/8" (10 mm)
max. distance
Floor
Sub-Floor
➤ For through-the-floor connections, use the below-floor installation method, when possible.
I
The discharge floor flange should be installed directly on the finished floor. However, if
the bottom of the floor flange and the bottom of the toilet must be at different heights,
make sure the bottom of the discharge floor flange rim is within 3/8" (10 mm) of the
bottom of the toilet, regardless of the installation method.
11
Floor
Rim
Discharge
Floor Flange
12
Floor
➤ Remove the template from the wall.
➤ Drill a 1" diameter hole in the center and
fasten the panel bracket to the wall.
(Above-Finished Floor Level Installation)
China Toilet
Base-Rear
3/8" (10 mm)
max. distance
Spacer
Floor
Sub-Floor
Toilets
Wall
Rim
Discharge
Floor Flange
EN

Advertisement

loading

This manual is also suitable for:

930094009500