Walk - Around Inspection Points (Sheet 2 Of 2) - JLG 330CRT Operation & Safety Manual

Hide thumbs Also See for 330CRT:
Table of Contents

Advertisement

21. Ground Controls - Switches operable, no visible
damage, placards secure and legible.
22. Control Valve - Valves properly secured, no visible
damage, no evidence of leakage. Hoses and fit-
tings properly secured, no visible damage, no evi-
dence of leaks.
23. Battery Installation (Gasoline or Diesel Engine) -
Proper electrolyte level, cables secure, no damage
or corrosion. Holddowns secure.
24. Medium Pressure Filter - No visible damage; prop-
erly secured; no evidence of leakage.
25. Steer Linkage - No loose or missing parts; no visi-
ble damage; No obstructions visible.
3121803
Figure 2-3. Walk - Around Inspection Points (Sheet 2 of 2)
– JLG Lift –
SECTION 2 - PREPARATION AND INSPECTION
26. Steer/Drive Wheel and Tire Assembly, Right Front -
Properly secured, no loose or missing lug nuts, no
visible damage. Refer to inflation psi stenciled on
frame.
27. Drive Motor, Right Front (4 Wheel Drive) - No visible
damage, no evidence of leakage.
28. Steer Cylinder and Tie Rod Ends - No loose or
missing parts, no visible damage. No steer cylinder
leaks or damage.
29. Platform Assembly (Not Shown) - No loose or miss-
ing parts, no visible damage, platform deck exten-
sion operates properly.
2-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

400crt

Table of Contents