Pumps-Plumbing-Flow Meter - USC AT500H Operator's Manual

Automated treater w/loss in weight seed metering
Hide thumbs Also See for AT500H:
Table of Contents

Advertisement

1. Check pump in forward and reverse.
2. Make sure pump heads open and close smoothly.
3. Inspect tubing for uneven wear. Replace pump tubing often to ensure high flow
rates can be achieved.
4. Make certain the inside of the tank is completely drained of chemical. Use clean
water to rinse out all chemical residue, then fill the tank with clean water.
5. Disconnect the discharge process lines from the treater static mixer assembly and
direct them to a receptacle large enough to hold all of the water from the mix tank.
6. Pump clean water through all areas of the plumbing and flow meter. Opening and
closing the valves during this process helps to remove residue from the ball valves.
7. Remove and clean the filter.
8. Open all drain points, valves, and filter to let as much of the water drain as possible.
9. Disconnect power to the flow meter.
Page 56
AT500H TREATER
PUMPS - PLUMBING - FLOW METER

Advertisement

Table of Contents
loading

Table of Contents