Download Print this page

Mercia Garden Products 0628PNNE0325HGDD1SW-V1 Assembly Instructions Manual

Advertisement

Quick Links

General Instructions
0628PNNE0325HGDD1SW-V1
28MM LOG CABIN, PENT NO EXTRAS, 3M X 2.5M, HALF GLAZED DOUBLE DOORS, ONE SHORT WINDOW.
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
BUILDING A BASE
When thinking about where the building and base are going to be constructed:
Ensure that there will be access (60cm) to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external
measurement of the building, i.e. the cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a hand
saw when cutting roof and
oor boards.
Screws & Nails
Bolts
To identify the
xings required
Measure
Measure
for each step use a
overall
under the
length
head
measuring tape.
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0628PNNE0325HGDD1SW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0628PNNE0325HGDD1SW-V1

  • Page 1 EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product. For assistance please contact customer care on: 01636 821215 Refer to the instructions pages for your speci c product code Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN www.merciagardenproducts.co.uk...
  • Page 2: Window Contents

    0628PNNE0325HGDD1SW-V1 Please retain product label and instructions for future reference Double Door Contents Overall Dimensions: Width = 3028mm Depth = 2823mm Height = 2378mm Base Dimensions: Width = 2792mm Depth = 2308mm Before assembly please make sure you have a...
  • Page 3 Please retain product label and instructions for future reference Bearer - 44x44x2308mm QTY 2 Bottom Gable QTY 2 F4444-2308-PT AI-0628PNNE0325HGDD1SW-G-V1 Bearer - 44x44x2720mm QTY 8 Top Gable A QTY 2 F4444-2720-PT AI-0628PNNE0325HGDD1SW-G-V1 Fascia - 16x120x3100mm QTY 2 Top Gable B QTY 2 S16120-3100 AI-0628PNNE0325HGDD1SW-G-V1 Starter Board - 66x28x3000mm QTY 2...
  • Page 4: Pre-Assembly

    Please retain product label and instructions for future reference Pre-assembly IMPORTANT: Pre-drill before xing screws. Step 2 Parts Needed - No. 35 QTY 6 *Please note: Following the same method arrange the remaining bearers Each board interlocks at either end in a staggered pattern. (No.
  • Page 5 Please retain product label and instructions for future reference Step 3 Step 4 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 24 QTY 2 Parts Needed - No. 25 QTY 6 No. 26 QTY 2 No. 26 QTY 10 No.
  • Page 6 Please retain product label and instructions for future reference Step 6 Step 5 IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 11 QTY 1 Parts Needed - No. 9 QTY 1 No. 10 QTY 1 No.
  • Page 7 Please retain product label and instructions for future reference Step 7 Step 9 Parts Needed - No. 25 QTY 6 To adjust and align your doors: No. 26 QTY 6 No. 29 QTY 12 1. Lift up the door of the hinge. No.
  • Page 8 Please retain product label and instructions for future reference Step 11 Step 10 IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 1 QTY 2 Parts Needed - No. 2 QTY 1 No. 7 QTY 4 No.
  • Page 9 Please retain product label and instructions for future reference Step 15 Step 13 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 22 QTY 2 Parts Needed - No. 25 QTY 6 No. 25 QTY 1 No. 26 QTY 6 No.
  • Page 10 Please retain product label and instructions for future reference Step 16 Step 17 IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 23a QTY 2 Parts needed - No. 33 QTY 1 No. 23b QTY 1 No.
  • Page 11 Please retain product label and instructions for future reference Step 18 Step 19 IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Parts needed - No. 38 QTY 28 Parts Needed - No. 40 QTY 2 Place the rst roof board (No. 38) Ensuring the roof boards are ush at the onto the log cabin, making sure the boards overhanging side, x the eaves frames...
  • Page 12 Please retain product label and instructions for future reference Step 20 Step 22 Lift each window onto the already existing Lift each door onto the already existing hooks on the window frame, ensuring the hooks on the door frame, ensuring the hook hook and bands connect.
  • Page 13 Please retain product label and instructions for future reference Step 23 IMPORTANT : Pre-drill before xing screws. Step 24 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 18 QTY 1 Parts Needed - No. 15 QTY 1 No. 19 QTY 1 No.
  • Page 14 Please retain product label and instructions for future reference Step 25 Step 26 IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 39 QTY 26 Parts needed - No. 41 QTY 6 Place the oor board (No.
  • Page 15 Please retain product label and instructions for future reference Step 29 Step 28 Parts Needed - No. 36 QTY 2 Parts needed - No. 43 No. 37 QTY 2 Cut the felt into four strips (3100mm (L) X Attach the fascia’s (No. 36 & 37) around 1000mm (W)) and lay onto the roof in the the building (ensuring to trap the felt order shown in the illustration.
  • Page 16 Please retain product label and instructions for future reference Step 31 Step 30 Parts Needed: No. 6 QTY 1 Parts needed - No. 42 QTY 8 No. 16 QTY 1 Arrange the storm braces (No.42) Attach the Rain Guards (No. 6) to the around the building (internally), Window frame, xing in place onto Placing two storm braces per side,...