Download Print this page

Advertisement

Quick Links

General Instructions
0628AXNE0503HGDD2MW-V1
28MM LOG CABIN, APEX, NO EXTRAS, 5M X 3M, HALF GLAZED DOUBLE DOORS, TWO MEDIUM WINDOWS.
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
BUILDING A BASE
When thinking about where the building and base are going to be constructed:
Ensure that there will be access (60cm) to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a hand
saw when cutting roof and
oor boards.
Screws & Nails
Measure
overall
length
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.
Bolts
To identify the
xings required
Measure
for each step use a
under the
measuring tape.
head
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0628AXNE0503HGDD2MW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0628AXNE0503HGDD2MW-V1

  • Page 1 EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product. For assistance please contact customer care on: 01636 821215 Refer to the instructions pages for your speci c product code Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN www.merciagardenproducts.co.uk...
  • Page 2: Window Contents

    0628AXNE0503HGDD2MW-V1 Please retain product label and instructions for future reference Double Door Contents Overall Dimensions: Width = 5134mm Depth = 3428mm Height = 2873mm Base Dimensions: Width = 4808mm Depth = 2804mm Before assembly please make sure you have a...
  • Page 3 Please retain product label and instructions for future reference Purlin - 45x120x3396mm QTY 5 F45120-AE-3396 Eaves Frame - 27x44x1698mm QTY 4 Gable QTY 2 F2744-1698 AI-0628AXNE0503HGDD2MW-G-V1 Fascia - 16x120x2653mm QTY 4 Starter Board - 28x66x5000mm QTY 2 S16120-G-2653 LB28RT66-A-5000 Fascia - 16x120x1713mm QTY 4 Log Board - 28x120x2996mm QTY 38 S16120-1713 LB28-A-2996...
  • Page 4: Pre-Assembly

    Please retain product label and instructions for future reference Pre-assembly Step 2 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 34 QTY 8 *Please note: Following same method, arrange the remaining bearers Each board interlocks at either end in a staggered pattern. (No.
  • Page 5 Please retain product label and instructions for future reference Step 5 Step 4 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 24 QTY 8 Parts Needed - No. 23 QTY 2 No. 25 QTY 8 No. 24 QTY 2 No.
  • Page 6 Please retain product label and instructions for future reference Step 7 Step 6 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 9 QTY 1 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 11 QTY 1 No. 10 QTY 1 No.
  • Page 7 Please retain product label and instructions for future reference Step 8 Step 10 To adjust and align your doors: Parts needed - No. 24 QTY 14 No. 26 QTY 14 1. Lift up the doors to separate the two parts of No.
  • Page 8 Please retain product label and instructions for future reference Step 11 Step 12 IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 2 QTY 2 Parts Needed - No. 1 QTY 2 No. 3 QTY 2 No.
  • Page 9 Please retain product label and instructions for future reference Step 14 Step 16 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 24 QTY 14 Parts needed - No. 22 QTY 2 No. 26 QTY 14 No. 27 QTY 14 Place the gable tops (No.
  • Page 10 Please retain product label and instructions for future reference Step 18 Step 17 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 31 QTY 64 Parts needed - No. 35 QTY 5 Place the rst two roof board’s Align the Roof Purlin(s) (No.
  • Page 11 Please retain product label and instructions for future reference Step 20 Step 19 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 36 QTY 4 Lift each window onto the already existing hooks on the window frame, ensuring the Ensuring the roof boards are ush at the hook and bands connect.
  • Page 12 Please retain product label and instructions for future reference Step 22 Step 23 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 18 QTY 1 Lift each door onto the already existing No. 19 QTY 1 hooks on the door frame, ensuring the hook No.
  • Page 13 Please retain product label and instructions for future reference Step 23 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 15 QTY 1 Step 25 IMPORTANT: Pre-drill before xing screws. No. 21 QTY 2 Parts neeeded - No. 32 QTY 44 Attach the Door Strip (No.
  • Page 14 Please retain product label and instructions for future reference Step 28 Step 26 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 41 Parts needed - No. 40 QTY 8 Roof Cut the felt into six strips and lay Inside the building place the closure onto the roof in the order shown trim (No.
  • Page 15 Please retain product label and instructions for future reference IMPORTANT : Pre-drill before xing screws. Step 29 IMPORTANT : Pre-drill before xing screws. Step 30 Parts needed - No. 37 QTY 4 Parts needed - No. 39 QTY 8 No. 38 QTY 4 Arrange the storm braces (No.39) Align the fascia’s (No’s.
  • Page 16 Please retain product label and instructions for future reference Step 31 IMPORTANT : Pre-drill before xing screws. Parts Needed: No. 6 QTY 2 No. 16 QTY 1 Attach the Rain Guards (No. 6) to the It is ESSENTIAL that you apply wood window frame, xing in place onto the treatment immediately after the building framing above each window using...