Download Print this page

Advertisement

Quick Links

General Instructions
0628LOG127-V5
0628LOG127-V5 28mm 3x3m corner cabin
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
BUILDING A BASE
When thinking about where the building and base are going to be constructed:
Ensure that there will be access (60cm) to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a hand
saw when cutting roof and
oor boards.
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0628LOG127-V5 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0628LOG127-V5

  • Page 1 Winter = High Moisture = Expansion 0628LOG127-V5 Summer = Low Moisture = Contraction erected by two adults 0628LOG127-V5 28mm 3x3m corner cabin BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY For ease of assembly, you CAUTION MUST pilot drill all screw Every e ort has been made during the - Check the pack and make sure you have all the parts listed.
  • Page 2 0628LOG127-V5 Please retain product label and instructions for future reference Overall Dimensions: Width = 4482mm Depth = 3723mm Log Board - 28x120x2028mm QTY 7 Height = 2923mm LB28-AGL-2028 (1x45 deg cut right) Base Dimensions: Width = 3255mm Depth = 3899mm...
  • Page 3 Please retain product label and instructions for future reference Storm Brace - 27x44x2000mm QTY 8 Roof Truss - 40x70x1710mm QTY 1 F2744-2000 AI-06LOGC3X3-FRTR Closure Trim - 16x28x2400mm (approx length) QTY 14 S1628-2400 Roof Truss - 40x70x1710mm QTY 1 AI-06LOGC3X3-FRTL Roof Truss - 40x70x2259mm QTY 3 Roof Block - 40x90x143mm QTY 1 AI-06LOGC3X3-CRT F4090-143 (54mm shoulder 1x20 deg cut)
  • Page 4 Please retain product label and instructions for future reference Floor Board Pack AI-0628LOG127-V3FBP Nail Bag MB16-C-2748 QTY 15 40mm Screw x320 70mm Bolt Set x16 MB16-P-2748 QTY 1 MB16-P-2734 QTY 1 30mm Screw x86 MB16-P-2622 QTY 1 120mm Screw x11 MB16-P-2510 QTY 1 MB16-P-2398 QTY 1 Felt Tacks x850...
  • Page 5 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 2 IMPORTANT: Pre-drill before xing screws. Step 1 Parts needed - No. 35 QTY 7 Parts needed - No. 34 QTY 1 No. 36 QTY 1 No.
  • Page 6 Please retain product label and instructions for future reference Step 3 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Step 4 (See Pre-Assembly) Parts Needed - No. 3 QTY 1 Parts needed - No. 6 QTY 1 No. 13 QTY 1 No.
  • Page 7 Please retain product label and instructions for future reference Step 6 (See Pre-Assembly) Step 8 Parts needed - No. 4 QTY 6 Parts needed - No. 1 QTY 2 No. 5 QTY 6 No. 10 QTY 12 Ensure that the lip of the No.
  • Page 8 Please retain product label and instructions for future reference Step 10 (See Pre-Assembly) Step 12 (See Pre-Assembly Parts needed - No. 7 QTY 1 Parts needed - No. 8 QTY 1 No.15 QTY 1 Make the assembly level by No. 17 QTY 1 adding another right hand No.
  • Page 9 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 14 IMPORTANT: Pre-drill before xing screws. Step 15 Parts needed - No. 31 QTY 1 Parts needed - No. 33 QTY 2 No. 32 QTY 1 No.
  • Page 10 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 17 IMPORTANT: Pre-drill before xing screws. Step 16 Parts needed - No. 23 QTY 1 Parts needed - No. 29 QTY 3 No. 24 QTY 1 No.
  • Page 11 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 19 IMPORTANT: Pre-drill before xing screws. Step 20 Parts needed - No. 50 QTY 2 Parts needed - No. 50 QTY 6 No. 51 QTY 2 No.
  • Page 12 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Step 21 Step 22 Parts needed - No. 50 QTY 6 Parts needed - No. 50 QTY 6 No. 51 QTY 6 No.
  • Page 13 Please retain product label and instructions for future reference Step 23 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Step 24 Parts needed - No. 50 QTY 10 Parts needed - No. 49 QTY 1 No. 51 QTY 10 No.
  • Page 14 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 26 IMPORTANT: Pre-drill before xing screws. Step 25 Parts needed - No. 45 QTY 7 Roof Parts needed - No. 45 QTY 7 Once the oor has been laid arrange the Inside the building place the closure closure trim (No.
  • Page 15 Please retain product label and instructions for future reference Step 27 Step 28 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 47 Parts needed - No. 47 Following the individual triangle Cut the remaining felt into 5x strips at shape(s) of the roof measure and cut 200mm wide and approximately the felt (No.
  • Page 16 Please retain product label and instructions for future reference Step 29 Step 30 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 42 QTY 2 Parts needed - No. 44 QTY 8 No. 43 QTY 3 Arrange the storm braces (No. 44) around the building (internally).