Download Print this page

Advertisement

Quick Links

General Instructions
0628LOG114-V4 (3x4m)
0628LOG114-V4: 3x4m 28mm log cabin
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
BUILDING A BASE
When thinking about where the building and base are going to be constructed:
Ensure that there will be access (60cm) to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a hand
saw when cutting roof and
oor boards.
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0628LOG114-V4 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0628LOG114-V4

  • Page 1 Winter = High Moisture = Expansion All building’s should be 0628LOG114-V4 (3x4m) Summer = Low Moisture = Contraction erected by two adults 0628LOG114-V4: 3x4m 28mm log cabin BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY For ease of assembly, you CAUTION MUST pilot drill all screw Every e ort has been made during the - Check the pack and make sure you have all the parts listed.
  • Page 2 0628LOG114-V4 Please retain product label and instructions for future reference Overall Dimensions: Width = 4110mm Depth = 4430mm Log Board - 28x120x3396mm QTY 2 Height = 2741mm LB28-AE-3396 Base Dimensions: Width = 3808mm Log Board (WA) - 28x120x3896mm QTY 2...
  • Page 3 Please retain product label and instructions for future reference Nail Bag 30mm Screw x72 70mm Bolt Set x32 Felt Tacks x600 70mm Screw x60 40mm Screw x554 Pre-assembly *Please note: Each board interlocks at either end in a staggered pattern. Before securing ensure that the boards are tted properly in their respective tongues and grooves.
  • Page 4 Please retain product label and instructions for future reference Step 1 Step 2 IMPORTANT: Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Parts needed - No. 13 QTY 2 Parts needed - No. 14 QTY 7 No. 14 QTY 2 Following the same method, Lay the starters (No.
  • Page 5 Please retain product label and instructions for future reference Step 4 Step 6 (See Window-Assembly) Parts needed - No. 5 QTY 6 Parts needed - No. 1 QTY 1 No. 7 QTY 6 No. 8 QTY 12 Refer to window assembly No.
  • Page 6 Please retain product label and instructions for future reference Step 9 IMPORTANT : Pre-drill before xing screws. Step 8 Parts needed - No. 9 QTY 1 Part needed - No. 5 QTY 12 No. 12 QTY 2 No. 6 QTY 6 No.
  • Page 7 Please retain product label and instructions for future reference Step 11 Step 12 IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Parts needed - No. 15 QTY 3 Parts needed - No. 18 QTY 80 Align the Roof Purlin(s) (No. Place the rst two roof 17) into the cut out slots on each board’s (No.
  • Page 8 Please retain product label and instructions for future reference IMPORTANT : Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Step 13 Step 14 Parts needed - No.17 QTY 4 Parts needed - No.19 QTY 34 Ensuring the roof boards are ush Place the rst oor board (No.
  • Page 9 Please retain product label and instructions for future reference Step 17 Step 15 Parts needed - No.23 Parts needed - No. 21 QTY 6 Roof Roof Cut the felt into seven strips & lay Inside the building place the closure onto the roof in the order shown in trim (No.
  • Page 10 Please retain product label and instructions for future reference Step 18 IMPORTANT : Pre-drill before xing screws. Parts needed - No. 16 QTY 4 Align the fascia’s (No. 16) with the roof and x into place using 3x40mm screws per fascia, making sure to screw through the It is ESSENTIAL that you apply wood fascia into the roof purlins...