Download Print this page

Advertisement

Quick Links

General Instructions
0628RANE0504FGDD2TW1SW-V1 (4x5m)
0628RANE0504FGDD2TW1SW-V1: 28mm Log Cabin, Reverse Apex, No Extras, 5x4, Fully Glazed Double Door, Two Tall Windows, One
Short Window.
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
BUILDING A BASE
When thinking about where the building and base are going to be constructed:
Ensure that there will be access (60cm) to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a hand
saw when cutting roof and
oor boards.
Screws & Nails
Bolts
To identify the
xings required
Measure
Measure
for each step use a
overall
under the
measuring tape.
length
head
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0628RANE0504FGDD2TW1SW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0628RANE0504FGDD2TW1SW-V1

  • Page 1 0628RANE0504FGDD2TW1SW-V1 (4x5m) Summer = Low Moisture = Contraction erected by two adults 0628RANE0504FGDD2TW1SW-V1: 28mm Log Cabin, Reverse Apex, No Extras, 5x4, Fully Glazed Double Door, Two Tall Windows, One Short Window. BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY For ease of assembly, you...
  • Page 2: Window Contents

    0628RANE0504FGDD2TW1SW-V1 Please retain product label and instructions for future reference Double Door Contents Overall Dimensions: Width = 5036mm Depth = 4141mm Height = 2688mm Rain Guards QTY 3 Base Dimensions: RG2844-710 (28x44x710mm) Width = 4808mm Depth = 3808mm Before assembly...
  • Page 3 Please retain product label and instructions for future reference Main Buildings Contents Purlin - 45x120x5004mm QTY 5 F45120-A-5004 Fascia - 16x120x2118mm QTY 4 S16120-G-2118 (angled) Gable - 4000mm QTY 2 AI-0628RANE0504-G-V1 Fascia - 16x120x2518mm QTY 4 S16120-2518 Starter Board - 28x66x5000mm QTY 2 Eaves Frame - 27x44x2502mm QTY 4 LB28RT66-A-5000 F2744-2502...
  • Page 4 Please retain product label and instructions for future reference Step 1 IMPORTANT: Pre-drill before xing screws. Step 3 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 38 QTY 2 Parts needed- No. 38 QTY 13 No. 39 QTY 2 No.
  • Page 5 Please retain product label and instructions for future reference Step 4 Step 6 IMPORTANT : Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 28 QTY 2 Parts Needed - No. 7 QTY 2 No. 29 QTY 2 No.
  • Page 6 Please retain product label and instructions for future reference Step 7 Step 9 IMPORTANT : Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 6 QTY 2 Parts Needed - No. 16 QTY 1 No. 17 QTY 1 Rest each window (No.
  • Page 7 Please retain product label and instructions for future reference Step 10 IMPORTANT: Pre-drill before xing screws. Step 11 Parts Needed - No. 14 QTY 1 No. 15 QTY 1 To adjust and align your doors: No. 22 QTY 6 1. Lift up the doors to seperate the two The Adjustable Door Hinge (No.22) parts of the hinge.
  • Page 8 Please retain product label and instructions for future reference Step 13 Step 14 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 29 QTY 6 Parts Needed - No. 2 QTY 1 No. 31 QTY 12 No. 3 QTY 1 No.
  • Page 9 Please retain product label and instructions for future reference Step 15 IMPORTANT: Pre-drill before xing screws. Step 17 Parts Needed - No. 1 QTY 1 Parts needed - No. 29 QTY 6 No. 12 QTY 2 No. 31 QTY 12 No.
  • Page 10 Please retain product label and instructions for future reference Step 19 Step 20 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 27 QTY 2 Parts needed - No. 40 QTY 5 Place the gable tops (No. 27) onto Align the Purlin(s) (No.
  • Page 11 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 22 IMPORTANT: Pre-drill before xing screws. Step 21 Parts needed - No. 43 QTY 4 Parts needed - No. 36 QTY 92 Ensuring the roof boards are Place the rst two roof board’s (No.
  • Page 12 Please retain product label and instructions for future reference Step 23 Step 24 Roof Roof Parts needed - No. 37 QTY 44 Parts needed - No. 45 QTY 8 Place the rst Floor Board (No. 37) Inside the building place the closure inside the building ush to the log trim (No.
  • Page 13 Please retain product label and instructions for future reference Step 26 Step 28 Lift each window onto the already existing Lift each door onto the already existing hooks on the window frame, ensuring the hooks on the door frame, ensuring the hook hook and bands connect.
  • Page 14 Please retain product label and instructions for future reference Step 30 Step 29 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 23 QTY 1 Parts Needed - No. 20 QTY 1 No. 26 QTY 2 No. 24 QTY 1 The Mortice Lock is Reversible No.
  • Page 15 Please retain product label and instructions for future reference Step 31 Step 32 Parts needed - No. 46 Parts needed - No. 44 QTY 8 Cut the felt (No. 46) into ve strips & Arrange the storm braces (No. 44) around lay onto the roof in the order shown the building (internally).
  • Page 16 Please retain product label and instructions for future reference IMPORTANT : Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Step 33 Step 34 Parts Needed: No. 11 QTY 3 Parts needed - No. 41 QTY 4 No. 21 QTY 1 No.