Download Print this page

Advertisement

Quick Links

General Instructions
0628RASH0302FBSDNW-V1
28MM LOG CABIN, REVERSE APEX, SHED EXTENSION, CORNER LODGE (PLUS), 5M X 3M, HALF
GLAZED DOUBLE DOORS, TWO SHORT WINDOWS, ONE FULLY BOARDED SINGLE DOOR.
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
BUILDING A BASE
When thinking about where the building and base are going to be constructed:
Ensure that there will be access (60cm) to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a hand
saw when cutting roof and
oor boards.
Screws & Nails
Measure
overall
length
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.
Bolts
To identify the xings
Measure
required for each step use a
under the
measuring tape.
head
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0628RASH0302FBSDNW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0628RASH0302FBSDNW-V1

  • Page 1 EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product. For assistance please contact customer care on: 01636 821215 Refer to the instructions pages for your speci c product code Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN www.merciagardenproducts.co.uk...
  • Page 2 0628RASH0302FBSDNW-V1 Please retain product label and instructions for future reference 5x3 Log Cabin Contents: Overall Dimensions: Width = 5078mm Depth = 3172mm Height = 2742mm Log Board - 28x120x2000mm QTY 21 Base Dimensions: Width = 4809mm LB28-B-2000 Depth = 2808mm...
  • Page 3 Please retain product label and instructions for future reference *Please note The components listed below are featured in both contents lists for the 3m x m3 Corner Cabin (0628CSBE0303HGDD2SW) as well as the 5m x 3m Corner Lodge. The component numbers listed below are the same component numbers as listed in the 3m x 3m Corner Cabin instructions, some numbers may be out of chronological order or skipped to satisfy this.
  • Page 4: Pre-Assembly

    Please retain product label and instructions for future reference Nail Bag There may be extra screws present in the nail bag 90mm Bolt Set x 8 70mm Screw x 72 70mm Bolt Set x 28 60mm Screw x 26 40mm Screw x 415 120mm Screw x 8 30mm Screw x 69 90mm Screw x 14...
  • Page 5 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 1 Step 2 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 53 QTY 1 Parts needed - No. 54 QTY 5 No. 54 QTY 1 No.
  • Page 6 Please retain product label and instructions for future reference Step 3 Step 4 Parts needed - No. 53 QTY 2 Parts needed - No. 91 QTY 9 No. 91 QTY 2 Arrange the remaining bearers (No. 91) inside the assembled frame. Lay the bearers (No.
  • Page 7 Please retain product label and instructions for future reference Step 5 ** Please Note: Your log cabin can be either Right Handed or Left Handed, dependant on your wants and needs. (See Contents for image reference) Please ensure to construct your Log Cabin by following either the ‘Left Handed’...
  • Page 8 Please retain product label and instructions for future reference Step 6 - Right Handed Step 6 - Left Handed IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 22 QTY 1 Parts Needed - No. 22 QTY 1 No.
  • Page 9 Please retain product label and instructions for future reference Step 7 IMPORTANT: Pre-drill before xing screws. Step 8 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 25 QTY 1 Parts needed - No. 23 QTY 6 No. 41 QTY 17 No.
  • Page 10 Please retain product label and instructions for future reference Step 9 IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Step 10 Parts Needed - No. 11 QTY 1 Parts Needed - No. 76 QTY 1 No. 12 QTY 1 No.
  • Page 11 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 11 Step 12 Parts Needed - No. 9 QTY 1 To adjust and align your doors: No. 10 QTY 1 No. 17 QTY 9 1. Lift up the doors to separate the two No.
  • Page 12 Please retain product label and instructions for future reference IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Step 14 Step 15 Parts needed - No. 23 QTY 6 No. 41 QTY 18 Parts Needed - No. 2 QTY 2 No.
  • Page 13 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Step 18 Step 16 Parts needed - No. 23 QTY 6 Parts Needed - No. 1 QTY 2 No. 41 QTY 18 No.
  • Page 14 Please retain product label and instructions for future reference Step 19 Step 20 Parts needed - No. 26 QTY 1 Parts needed - No. 28 QTY 1 No. 35 QTY 1 Make the log cabin level by No. 37 QTY 1 adding another right hand No.
  • Page 15 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Step 21 Step 22 Parts needed - No. 27 QTY 1 No. 41 QTY 3 Parts needed - No. 38 QTY 1 No.
  • Page 16 Please retain product label and instructions for future reference Step 23 Step 24 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 94 QTY 2 Parts needed - No. 74 QTY 2 Place the double storm braces (No.94) on either side of the log cabin, (Internally and externally) ensuring to Place the gable tops (No.
  • Page 17 Please retain product label and instructions for future reference Step 25 IMPORTANT: Pre-drill before xing screws. Step 26 - Left Handed IMPORTANT: Pre-drill before xing screws. Parts needed - No. 50 QTY 1 Parts needed - No. 48 QTY 1 No.
  • Page 18 Please retain product label and instructions for future reference Step 27 IMPORTANT: Pre-drill before xing screws. Step 28 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 49 QTY 1 Parts needed - No. 48 QTY 4 Place ‘Roof Truss B’ (No. 49) between Roof Truss A (No.48) and Place 2x ‘Roof Truss A’...
  • Page 19 Please retain product label and instructions for future reference Step 29 IMPORTANT: Pre-drill before xing screws. Step 30 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 46 QTY 1 Parts needed - No. 42 QTY 1 No. 47 QTY 1 No.
  • Page 20 Please retain product label and instructions for future reference Step 31 Step 32 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 48 QTY 2 Parts needed - No. 48 QTY 2 No. 89 QTY 2 Locate two ‘Roof Truss A’...
  • Page 21 Please retain product label and instructions for future reference Step 33 IMPORTANT: Pre-drill before xing screws. Step 34 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 48 QTY 2 No. 88 QTY 2 You can now x the assembled roof truss’s to the log cabin, making sure the attached blocks sit inside the assembly.
  • Page 22 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 35 Parts needed - No. 71 QTY 1 Pack A No. 72 QTY 2 Pack B Left Handed Right Handed No. 73 QTY 2 Pack C No.
  • Page 23 Please retain product label and instructions for future reference Step 36 Step 37 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 71 Parts needed - No. 71 No. 72 No. 72 No. 73 No. 73 No.
  • Page 24 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Step 38 Step 39 Parts needed - No. 71 Parts needed - No. 71 No. 72 No. 72 No. 73 No. 73 No.
  • Page 25 Please retain product label and instructions for future reference Step 42 Step 40 Lift each door onto the already existing Lift each window onto the already existing hooks on the door frame, ensuring the hook hooks on the window frame, ensuring the and bands connect.
  • Page 26 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 43 IMPORTANT: Pre-drill before xing screws. Step 44 Parts Needed - No. 18 QTY 1 Parts Needed - No. 81 QTY 1 No. 19 QTY 1 No.
  • Page 27 Please retain product label and instructions for future reference Step 45 IMPORTANT: Pre-drill before xing screws. Step 46 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 15 QTY 1 Parts needed - No. 70 QTY 1 No. 21 QTY 2 No.
  • Page 28 Please retain product label and instructions for future reference Step 47 Step 49 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 67 QTY 12 Parts needed - No. 68 Measure and cut the felt (No.68) Inside the building place the closure Roof using the dimensions given below as trim (No.
  • Page 29 Please retain product label and instructions for future reference Step 51 Step 50 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 62 QTY 1 Parts needed - No. 68 No. 63 QTY 1 No. 64 QTY 4 Measure and cut the remaining No.
  • Page 30 Please retain product label and instructions for future reference Step 52 IMPORTANT: Pre-drill before xing screws. Step 53 Parts needed - No. 66 QTY 14 Parts Needed: No. 6 QTY 2 No. 16 QTY 1 Arrange the storm braces (No. 66) around No.