Download Print this page

Mercia Garden Products 0628WKNE0304LBDD2SW-V1 General Instructions Manual

28mm log cabin, workshop, no extras, 3x4m, ledged braced double doors, two short windows

Advertisement

Quick Links

General Instructions
0628WKNE0304LBDD2SW-V1
28MM LOG CABIN, WORKSHOP, NO EXTRAS, 3X4M, LEDGED BRACED DOUBLE DOORS, TWO SHORT WINDOWS
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
BUILDING A BASE
When thinking about where the building and base are going to be constructed:
Ensure that there will be access (60cm) to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a hand
saw when cutting roof and
oor boards.
Screws & Nails
Bolts
To identify the
xings required
Measure
Measure
for each step use a
overall
under the
measuring tape.
length
head
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0628WKNE0304LBDD2SW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0628WKNE0304LBDD2SW-V1

  • Page 1 EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product. For assistance please contact customer care on: 01636 821215 Refer to the instructions pages for your speci c product code Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN www.merciagardenproducts.co.uk...
  • Page 2 0628WKNE0304LBDD2SW-V1 Please retain product label and instructions for future reference Double Door Contents Overall Dimensions: Width = 3113mm Depth = 4036mm Height = 2609mm Base Dimensions: Width = 2804mm Depth = 3808mm Before assembly please make sure you have a...
  • Page 3 Please retain product label and instructions for future reference Main Building Contents Fascia - 120x16x1604mm QTY 4 S16120-G-1604 (1X14° CUT) Eaves Frame - 27x44x2002mm QTY 4 F2744-2002 Gable - 2996mm QTY 2 AI-0628WKNE0304LBDD2SW-G-V1 Log Board - 120x28x2996mm QTY 1 LB28-AD-2996 Starter Board - 66x28x2996mm QTY 2 LB28RT66-A-2996 Log Board - 110x28x4000mm QTY 1...
  • Page 4 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Pre-assembly Step 2 Parts Needed - No. 31 QTY 8 *Please note: Following the same method Each board interlocks at arrange the remaining bearers (No. 31) inside the assembled either end in a staggered pattern.
  • Page 5 Please retain product label and instructions for future reference Step 3 IMPORTANT: Pre-drill before xing screws. Step 4 Parts Needed - No. 23 QTY 2 Parts Needed - No. 24 QTY 6 No. 27 QTY 2 No. 26 QTY 6 No.
  • Page 6 Please retain product label and instructions for future reference Step 5 IMPORTANT : Pre-drill before xing screws. Step 6 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 11 QTY 1 Parts Needed - No. 9 QTY 1 No. 12 QTY 1 No.
  • Page 7 Please retain product label and instructions for future reference Step 7 Step 8 Parts Needed - No. 24 QTY 6 Once you have laid 6 log boards (on top of the No. 25 QTY 6 starter board) up the door section, slide the No.
  • Page 8 Please retain product label and instructions for future reference Step 9 Step 10 IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 2 QTY 2 Parts Needed - No. 1 QTY 2 No. 3 QTY 2 No.
  • Page 9 Please retain product label and instructions for future reference Step 12 Step 13 Parts Needed - No. 24 QTY 6 Parts Needed - No. 24 QTY 1 No. 25 QTY 6 No. 29 QTY 1 No. 26 QTY 12 No. 36 QTY 1 No.
  • Page 10 Please retain product label and instructions for future reference Step 14 IMPORTANT: Pre-drill before xing screws. Step 15 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 22 QTY 2 Parts needed - No. 30 QTY 3 Place the gable tops (No. 22) Align the Roof Purlins (No.
  • Page 11 Please retain product label and instructions for future reference Step 16 IMPORTANT: Pre-drill before xing screws. Step 17 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 35 QTY 4 Parts needed - No. 39 QTY 74 Place the rst two roof Ensuring the roof boards are ush board’s (No.
  • Page 12 Please retain product label and instructions for future reference Step 19 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Step 18 Parts needed - No. 33 QTY 6 Parts Needed - No. 39 QTY 35 Roof Roof Inside the building place the closure Place the rst oor board (No.
  • Page 13 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 21 Step 22 Parts needed - No. 42 Parts Needed - No. 34 QTY 4 Cut the felt into four strips and lay Align the fascia’s (No. 34) with onto the roof in the order shown the roof and x into place in the illustration.
  • Page 14 Please retain product label and instructions for future reference IMPORTANT : Pre-drill before xing screws. Step 23 Step 24 Parts needed - No. 41 QTY 8 Lift each door onto the Arrange the storm braces (No.41) already existing hooks on the around the building (internally).
  • Page 15 Please retain product label and instructions for future reference Step 26 IMPORTANT : Pre-drill before xing screws. Step 25 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 15 QTY 1 Parts Needed - No. 18 QTY 2 No. 21 QTY 2 No.
  • Page 16 Please retain product label and instructions for future reference Step 29 Step 27 Parts Needed: No. 6 QTY 2 No. 16 QTY 1 Lift each window onto the already existing hooks on the window frame, ensuring the Attach the Rain Guard (No. 6) to the hook and bands connect.