Download Print this page
Mercia Garden Products 0628RANE0403HGDD2SW-V1 General Instructions Manual

Mercia Garden Products 0628RANE0403HGDD2SW-V1 General Instructions Manual

28mm log cabin, reverse apex, no extras, 4x3m, half glazed double doors two short windows

Advertisement

Quick Links

General Instructions
0628RANE0403HGDD2SW - V1
28MM LOG CABIN, REVERSE APEX, NO EXTRAS, 4X3M, HALF GLAZED DOUBLE DOORS TWO SHORT WINDOWS.
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a hand
saw when cutting roof and
oor boards.
Screws & Nails
Measure
overall
length
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.
Bolts
To identify the xings
Measure
required for each step use a
under the
measuring tape.
head
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0628RANE0403HGDD2SW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0628RANE0403HGDD2SW-V1

  • Page 1 EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product. For assistance please contact customer care on: 01636 821215 Refer to the instructions pages for your speci c product code Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN www.merciagardenproducts.co.uk...
  • Page 2: Window Contents

    0628RANE0403HGDD2SW-V1 Please retain product label and instructions for future reference Double Door Contents Overall Dimensions: Width = 4036mm Depth = 3142mm Height = 2600mm Base Dimensions: Width = 3808mm Depth = 2799mm Before assembly please make sure you have a...
  • Page 3 Please retain product label and instructions for future reference Bearer - 44x44x2799mm QTY 2 F4444-2799-PT Bearer - 44x44x3720mm QTY 10 F4444-3720-PT Gable - 2996mm QTY 2 AI-0628RANE0403HGDD2SW-G Purlin - 45x120x4004mm QTY 3 F45120-A-4004 Starter Board - 28x66x4000mm QTY 2 LB28RT66-A-4000 Eaves Frame - 27x44x2000mm QTY 4 F2744-2000 Log Board - 28x120x2996mm QTY 25...
  • Page 4: Pre-Assembly

    Please retain product label and instructions for future reference Step 2 Pre-assembly Parts Needed - No. 36 QTY 8 *Please note: Following the same method, arrange the remaining bearers Each board interlocks at either end in a staggered pattern. (No. 36) inside the assembled frame.
  • Page 5 Please retain product label and instructions for future reference Step 4 Step 3 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 24 QTY 10 Parts Needed - No. 23 QTY 2 No. 25 QTY 6 No. 24 QTY 2 No.
  • Page 6 Please retain product label and instructions for future reference Step 5 IMPORTANT : Pre-drill before xing screws. Step 6 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 11 QTY 1 Parts Needed - No. 9 QTY 1 No. 12 QTY 1 No.
  • Page 7 Please retain product label and instructions for future reference Step 7 Step 9 To adjust and align your doors: Parts needed - No. 24 QTY 6 No. 25 QTY 12 1. Lift up the doors to separate the two parts No.
  • Page 8 Please retain product label and instructions for future reference Step 11 IMPORTANT : Pre-drill before xing screws. Step 10 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 1 QTY 2 Parts Needed - No. 2 QTY 2 No. 7 QTY 4 No.
  • Page 9 Please retain product label and instructions for future reference Step 13 Step 15 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 24 QTY 6 Parts needed - No. 22 QTY 2 No. 25 QTY 12 No. 27 QTY 6 Place the gable tops (No.
  • Page 10 Please retain product label and instructions for future reference Step 17 Step 18 IMPORTANT: Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Parts needed - No. 33 QTY 74 Parts needed - No. 37 QTY 3 Align the Roof Purlins (No.37) Place the rst two roof board’s into the cut out slots on each gable top...
  • Page 11 Please retain product label and instructions for future reference Step 19 IMPORTANT : Pre-drill before xing screws. Parts needed - No. 38 QTY 4 Step 20 Ensuring the roof boards are ush Lift each window onto the already existing at the overhanging side and meet hooks on the window frame, ensuring the at the apex, x the Eaves Frames hook and bands connect.
  • Page 12 Please retain product label and instructions for future reference Step 22 Step 23 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 18 QTY 1 Lift each door onto the already existing No. 19 QTY 1 The Mortice Lock is Reversible hooks on the door frame, ensuring the hook No.
  • Page 13 Please retain product label and instructions for future reference Step 25 Step 24 IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 15 QTY 1 Parts neeeded - No. 34 QTY 35 No. 21 QTY 2 Place the rst oor board (No.
  • Page 14 Please retain product label and instructions for future reference Step 28 Step 26 IMPORTANT : Pre-drill before xing screws. Parts needed - No. 43 Parts needed - No. 42 QTY 6 Roof Roof Cut the felt into four strips and Inside the building place the closure lay onto the roof in the order trim (No.
  • Page 15 Please retain product label and instructions for future reference Step 30 Step 29 IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Parts needed - No. 39 QTY 4 Parts Needed: No. 6 QTY 2 No. 40 QTY 4 No.
  • Page 16 Please retain product label and instructions for future reference Step 31 Parts needed - No. 41 QTY 8 Arrange the storm braces (No. 41) around the building (internally). Place 2x storm It is ESSENTIAL that you apply wood braces per side xing into place using 2x treatment immediately after the building 70mm bolts per brace making sure the has been assembled.