Download Print this page

Mercia Garden Products 0628CSNE0303HGDD2SW-V1 General Instructions Manual

28mm log cabin, corner standard, no extras, 3x3m, half glazed double doors, two short windows

Advertisement

Quick Links

General Instructions
0628CSNE0303HGDD2SW-V1
28MM LOG CABIN, CORNER STANDARD, NO EXTRAS, 3X3M, HALF GLAZED DOUBLE
DOORS, TWO SHORT WINDOWS.
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
BUILDING A BASE
When thinking about where the building and base are going to be constructed:
Ensure that there will be access (60cm) to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a hand
saw when cutting roof and
oor boards.
Screws & Nails
Measure
overall
length
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.
Bolts
To identify the xings
Measure
required for each step use a
under the
measuring tape.
head
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0628CSNE0303HGDD2SW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0628CSNE0303HGDD2SW-V1

  • Page 1 EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product. For assistance please contact customer care on: 01636 821215 Refer to the instructions pages for your speci c product code Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN www.merciagardenproducts.co.uk...
  • Page 2: Window Contents

    0628CSNE0303HGDD2SW-V1 Please retain product label and instructions for future reference Double Door Contents Overall Dimensions: Roof Assembly 1 Width = 4431mm Depth = 3309mm Height = 2912mm Base Dimensions: Width = 3971mm Depth = 2988mm Roof Assembly 2 Master Door QTY 1...
  • Page 3 Please retain product label and instructions for future reference Starter Board - 28x66x2191mm QTY 1 Log Board - 28x120x1625mm QTY 7 Roof Truss B - 40x140x2225mm QTY 1 LB28RT66-AGRL-2191 (1x45 deg cut top, 1x45 deg cut bottom) LB28-AGR-1625 (1x45 deg cut right) AI-06LOGC3RTB-V1 Log Board - 28x120x311mm QTY 18 Log Board - 28x120x1625mm QTY 1...
  • Page 4 Please retain product label and instructions for future reference Roof Board Pack A QTY 1 AI-06LOGC3X3-RBP1-V2 Fascia - 16x120x3100mm QTY 1 SR16120-3100 Fascia - 16x120x2225mm QTY 1 *HINT: keep the roof board packs S16120-2225 seperate to prevent mixing them up. Fascia - 16x120x2000mm QTY 2 S16120-2000 Fascia - 16x120x1658mm QTY 2...
  • Page 5: Pre-Assembly

    Please retain product label and instructions for future reference Nail Bag There may be extra screws present in the nail bag 70mm Bolt Set x 16 70mm Screw x 85 120mm Screw x 12 40mm Screw x 666 90mm Screw x 10 30mm Screw x 182 Felt Tacks x 850 80mm Screw x 24...
  • Page 6 Please retain product label and instructions for future reference Step 1 IMPORTANT: Pre-drill before xing screws. Step 2 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 54 QTY 5 The following steps show how to No. 55 QTY 1 construct a 3m x 3m corner cabin.
  • Page 7 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Step 3 Step 4 Parts Needed - No. 22 QTY 1 Parts needed - No. 25 QTY 1 No. 32 QTY 1 No.
  • Page 8 Please retain product label and instructions for future reference Step 6 Step 7 IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 11 QTY 1 Parts Needed - No. 9 QTY 1 No. 12 QTY 1 No.
  • Page 9 Please retain product label and instructions for future reference Step 8 Step 10 Parts needed - No. 23 QTY 6 To adjust and align your doors: No. 24 QTY 6 No. 29 QTY 12 No. 30 QTY 6 1. Lift up the doors to separate the two parts No.
  • Page 10 Please retain product label and instructions for future reference IMPORTANT : Pre-drill before xing screws. Step 11 Step 12 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 2 QTY 2 Parts Needed - No. 1 QTY 2 No. 3 QTY 2 No.
  • Page 11 Please retain product label and instructions for future reference Step 13 Step 15 Parts needed - No. 26 QTY 1 Once you have laid the second level of boards onto the log cabin slide the Make the log cabin level by windows between smaller...
  • Page 12 Please retain product label and instructions for future reference Step 18 Step 17 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 38 QTY 1 Parts needed - No. 27 QTY 1 No. 39 QTY 1 No. 34 QTY 1 No.
  • Page 13 Please retain product label and instructions for future reference Step 20 Step 19 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 50 QTY 1 Parts needed - No. 74 QTY 1 No. 51 QTY 1 Roof Assembly 1 No.
  • Page 14 Please retain product label and instructions for future reference Step 21 - Roof Assembly 1 IMPORTANT: Pre-drill before xing screws. Step 22 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 48 QTY 1 Parts needed - No. 49 QTY 1 Roof Assembly 1 No.
  • Page 15 Please retain product label and instructions for future reference Step 23 IMPORTANT: Pre-drill before xing screws. Step 24 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 48 QTY 3 Parts needed - No. 46 QTY 1 No. 47 QTY 1 Place 2x ‘Roof Truss A’...
  • Page 16 Please retain product label and instructions for future reference Step 25 IMPORTANT: Pre-drill before xing screws. Step 26 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 42 QTY 1 Parts needed - No. 48 QTY 2 No. 43 QTY 1 Roof Assembly 1 No.
  • Page 17 Please retain product label and instructions for future reference Step 27 Step 28 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. You can now x the assembled roof Parts needed - No. 71 QTY 1 Pack A truss’s and Roof Purlin to the log No.
  • Page 18 Please retain product label and instructions for future reference Step 29 Step 30 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 71 Parts needed - No. 71 No. 72 No. 72 No. 73 No. 73 Roof Assembly 1 *HINT: keep the roof board packs *HINT: keep the roof board...
  • Page 19 Please retain product label and instructions for future reference Step 31 IMPORTANT: Pre-drill before xing screws. Step 32 Parts needed - No. 71 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 71 No. 72 No. 72 No. 73 Roof Assembly 1 No.
  • Page 20 Please retain product label and instructions for future reference Step 33 Step 35 Lift each window onto the already existing Lift each door onto the already existing hooks on the window frame, ensuring the hooks on the door frame, ensuring the hook hook and bands connect.
  • Page 21 Please retain product label and instructions for future reference Step 36 Step 37 Parts Needed - No. 18 QTY 1 Parts Needed - No. 15 QTY 1 The Mortice Lock is Reversible No. 19 QTY 1 No. 21 QTY 2 No.
  • Page 22 Please retain product label and instructions for future reference Step 38 Step 39 Parts needed - No. 68 Parts needed - No. 68 Measure and cut the felt (No.68) using the dimensions given below as Measure and cut the remaining a guide.
  • Page 23 Please retain product label and instructions for future reference Step 40 IMPORTANT: Pre-drill before xing screws. Step 41 Parts needed - No. 70 QTY 1 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 67 QTY 7 oor boards (No. 70) Place the Inside the building place the closure inside the building ush to the log...
  • Page 24 Please retain product label and instructions for future reference Step 43 IMPORTANT: Pre-drill before xing screws. Step 44 Parts needed - No. 62 QTY 1 Parts needed - No. 66 QTY 8 No. 63 QTY 1 No. 64 QTY 2 Arrange the storm braces (No.
  • Page 25 Please retain product label and instructions for future reference Step 45 Parts Needed: No. 6 QTY 2 No. 16 QTY 1 Attach the Rain Guards (No.6) to the window frame, xing in place onto the It is ESSENTIAL that you apply wood framing above each window using treatment immediately after the building 3x70mm screws per guard.