Figure 15 Power On Using Power Control Signal; Figure 16 Power On Using Power Control Signal - Power Down Using Radio Power/Reset - Enfora Enabler II-G Integration Manual

Quad band gsm/gprs modems
Hide thumbs Also See for Enabler II-G:
Table of Contents

Advertisement

Integration Guide
Version 1.01
Figure 15 shows a power on with the PWR_CTL_SIGNAL signal, but a shutdown with the RADIO_PWR/RST
signal.
BATT
RADIO_PWR/
RST
PWR_CTL
50ms
_SIGNAL
System
State
Figure 15 Power On Using Power Control Signal – Power Down Using Radio Power/Reset
GSM0108PB001
Page 34
Power removed
from baseband
1.01 – 01/21/05

Advertisement

Table of Contents
loading

Table of Contents