Adjusting the Tilt
1.
Park the machine on a level surface, disengage
the blade-control switch (PTO), and move the
motion-control levers outward to the P
position.
2.
Shut off the machine, remove the key, and wait
for all moving parts to stop before leaving the
operating position.
3.
Loosen the upper bolt holding the control lever
to the control arm shaft.
4.
Loosen the lower bolt just enough to pivot the
control lever fore or aft. Tighten both bolts to
secure the control in the new position.
Figure 69
5.
Repeat the adjustment for the opposite control
lever.
Figure 70
Calibrating the Levers
Note:
The InfoCenter displays only 2 items at a time;
however, the following figures show the full menus
ARK
for context.
1.
Park the machine on a level surface, disengage
the PTO, and move the motion-control levers
outward to the P
2.
Enable access to protected menus; refer to
Accessing Protected Menus (page
3.
In the M
press the
4.
In the S
C
ALIBRATION
g401470
5.
Follow the prompts on the screen. Press the
button after each step; to exit calibration, press
the Exit button.
Screen
g009195
44
position.
ARK
, scroll down to S
AIN MENU
button .
Figure 71
menu, scroll down to L
ERVICE
and press the
Figure 72
Action
Press the
Hold the left motion-control
lever in the full F
position and press the
button.
17).
and
ERVICE
g376300
EVER
button.
g425329
button.
ORWARD
Need help?
Do you have a question about the Revolution Series and is the answer not in the manual?