Advertisement

Quick Links

UltraQ-AMT
Installation Instructions
Alvarado Manufacturing Company, Inc.
12660 Colony Street, Chino, CA 91710
Telephone: +1 (909) 591-8431
Fax: +1 (909) 628-1403
helpdesk@alvaradomfg.com
www.alvaradomfg.com
PUD4477 R1.0

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UltraQ-AMT and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Alvarado UltraQ-AMT

  • Page 1 UltraQ-AMT Installation Instructions Alvarado Manufacturing Company, Inc. 12660 Colony Street, Chino, CA 91710 Telephone: +1 (909) 591-8431 Fax: +1 (909) 628-1403 helpdesk@alvaradomfg.com www.alvaradomfg.com PUD4477 R1.0...
  • Page 2: Table Of Contents

    UltraQ-AMT Installation Instructions Contents Contents..................................2 Safety Icons..................................3 Safety Precautions................................3 Tools Required (Fixed Turnstile Installation)........................4 Parts List..................................5 Overview..................................6 Power..................................6 Communication................................. 6 Installation Steps............................... 6 Before You Begin..............................7 Site Preparation.
  • Page 3: Safety Icons

    This symbol is used in this manual to designate useful information for the installer and operator. Please NOTE read these instructions. For questions, please contact Alvarado at (909) 591-8431, Monday – Friday 7:00am to 4:00pm PST. Please read this manual completely before installing or operating the purchased product. Safety Precautions WARNING •...
  • Page 4: Tools Required (Fixed Turnstile Installation)

    UltraQ-AMT Installation Instructions Tools Required (Fixed Turnstile Installation) • Socket Wrench • #1 Phillips Head Screwdriver • Hammer Drill • Precision Flat Head Screwdriver • 5/8" Concrete Drill Bit • Torque Wrench (ft-lbs) • Shop Vac • 9/16" Deep Socket •...
  • Page 5: Parts List

    Parts List This product is shipped with installation hardware. Make sure that no parts are missing or damaged before beginning installation. If parts are missing or damaged, please stop the installation and contact Alvarado. Hardwired UltraQ Head Wireless UltraQ Head (Qty.
  • Page 6: Overview

    UltraQ-AMT Installation Instructions Overview This manual covers the physical installation process for UltraQ-AMT Intelligent Admission Turnstiles. At the end of this process, you will be able to power up the turnstile and perform a basic functions check to validate certain aspects of operation.
  • Page 7: Before You Begin

    For portable turnstile installations, proceed to Appendix A - Portable Base Turnstile on page 24. Site Preparation Use only skilled technicians for site preparation and installation of the turnstile using Alvarado’s instructions. Refer to the footprint and plan drawings [Fig. 1] & [Fig. 2] to determine the installation location and conduit requirements.
  • Page 8: Space & Conduit Requirements (Cont.)

    UltraQ-AMT Installation Instructions Space & Conduit Requirements (cont.) Fig. 3 Fig. 3 Fig. 4 Fig. 4 SCREEN Page 8 For Assistance: support@alvaradomfg.com +1 (909) 591-8431 PUD4477 R1.0...
  • Page 9: Anchoring The Turnstile

    UltraQ-AMT Installation Instructions Anchoring the Turnstile Fig. 5 Fig. 5 1. Using a #1 Phillips-head screwdriver, unlatch the four quarter-turn fasteners that secure the access panel to the turnstile cabinet [Fig. 5]. The screws will remain attached to the access panel.
  • Page 10: Primary Power Wiring Instructions

    UltraQ-AMT Installation Instructions Primary Power Wiring Instructions The following instructions are for fixed turnstile installations only. If you are installing NOTE a portable AC-powered or battery-powered unit, please refer to Appendix A - Portable Base Turnstile section on page 28.
  • Page 11: Control Board Description

    UltraQ-AMT Installation Instructions Control Board Description Fig. 10 Fig. 10 Signal Inputs and Outputs To / From Access Control System Inputs - J4 Terminal Block Signal inputs are wired into the EDM’s I/O input terminal block. There are two types of input signals, momentary dry contacts (MDC) and sustained dry contacts (SDC).
  • Page 12: Control Board Description (Cont.)

    UltraQ-AMT Installation Instructions Control Board Description (Cont.) Refer to [Table 2] for pin locations on the terminal block related to the emergency override system. Table 2 Pin # Pin Name Function Contact Function & Behavior Description Description Time EMROVR Emergency Drops the arms for free egress.
  • Page 13: Wiring The Control Board For Emergency Override

    UltraQ-AMT Installation Instructions Wiring the Control Board for Emergency Override Emergency alarm systems, such as fire alarms or life safety systems, can be connected to the AMT's control board. If the alarm is triggered and provides a sustained dry contact to the correct port on the controller board, the AMT will drop its arms to create a free passage to allow guests to exit the facility rapidly.
  • Page 14: Ultraq Installation

    UltraQ-AMT Installation Instructions UltraQ Installation Fig. 13 Fig. 13 1. Use a 3/32" hex key to remove the three hex screws securing the lid to the turnstile cabinet and remove the lid. [Fig. 13] (3) Hex Lid Screws Fig. 14 Fig.
  • Page 15 UltraQ-AMT Installation Instructions UltraQ Installation (Cont.) Fig. 16 Fig. 16 4. Feed the cables through the top of the opening and slide the UltraQ into position. [Fig. 16] Fig. 17 Fig. 17 5. Guide the metal ring from the UltraQ mounting kit up through the cables coming from the UltraQ until you reach the UltraQ post.
  • Page 16: Ultraq Connection Instructions

    UltraQ-AMT Installation Instructions UltraQ Connection Instructions Ensure turnstile power is OFF before connecting UltraQ cabling. NOTE 1. Connect the 6-prong power cable (yellow, red, and black wires) from the UltraQ to the power connector from the turnstile. [Fig. 19] 2. Connect the 2-prong feedback cable (orange and blue wires) from the UltraQ to the connector from the turnstile.
  • Page 17 UltraQ-AMT Installation Instructions UltraQ Connection Instructions (Cont.) Fig. 20 Fig. 20 3. Use the 3/8" nut driver to remove the nut on the upper-right corner of the electrical panel. [Fig. 20] 4. Place the ground wire (green and yellow) ring connector on the grounding screw.
  • Page 18: Post-Installation Inspection

    UltraQ-AMT Installation Instructions Post-Installation Inspection Perform this post-installation inspection BEFORE powering on the turnstile for the first time. 1. Anchoring (fixed installations only): Verify the anchor bolts are tensioned to 20 ft-lbs. Tighten if necessary. 2. UltraQ: Verify the mounting hardware is secure. Tighten if necessary.
  • Page 19: Power On

    UltraQ-AMT Installation Instructions Power On Fig. 22 Fig. 22 1. Power on the turnstile by pushing the recessed power button on the back of the turnstile cabinet using the eraser end of a pencil (or similar shaped object). [Fig. 22].
  • Page 20: Perform Ultraq Device Tests

    Fig. 25 4. From the Operator Functions Menu, press the Device Setup button [Fig. 25]. 5. If prompted, use the on-screen keyboard to enter alvarado for the setup screen password. 6. Press the ADVANCED SETUP button. Fig. 26 Fig. 26 7.
  • Page 21: Scan A Sample Barcode Ticket

    UltraQ-AMT Installation Instructions Scan a Sample Barcode Ticket Fig. 27 Fig. 27 To scan a barcode on a printed ticket or a mobile phone screen, place the barcode on the blackout pad facing up towards the imager [Fig. 27]. Line the barcode up with the green guide light.
  • Page 22: Test Drop Arm Operation

    UltraQ-AMT Installation Instructions Test Drop Arm Operation Fig. 29 Fig. 29 The turnstile is designed for the horizontal arm to drop upon loss of power. To test drop-arm functionality: 1. Power OFF the turnstile 2. Verify the horizontal arm drops allowing free egress [Fig.
  • Page 23: Test Key Override Operation

    UltraQ-AMT Installation Instructions Test Key Override Operation Key Override switches are provided to manually place the turnstile in one of two passage modes: Free Passage and Controlled Passage. There is one key override switch per rotation direction. The key switches are located on the underside of the of the turnstile adjacent to the head and arms [Fig.
  • Page 24: Edm Utility

    EDM Utility The UltraQ-AMT ships with the EDM Utility which allows adjustment of settings and tests turnstile functionality. The EDM Utility is on a USB drive included with the turnstile. Copy the file from the USB drive to your laptop. There is no installation required.
  • Page 25 UltraQ-AMT Installation Instructions Settings Description Item # Sets the communication port necessary for the EDM Utility to Com Port interface with the turnstile. Access CW Activates the turnstile in the Clockwise direction. Access CCW Activates the turnstile in the Counter-Clockwise direction.
  • Page 26: Post-Installation Checklist

    Check that the mounting bolts and screws are secure and tightened per the requirements in this manual. 7. Finish Stainless Steel – Wipe down the entire turnstile with a damp cloth or used the Alvarado recommended commercial products (see Operation and Maintenance Instructions). Powder Coated - Wipe down entire turnstile with a damp cloth.
  • Page 27: Troubleshooting

    UltraQ-AMT Installation Instructions Troubleshooting This basic troubleshooting section is provided to aid installers with the most commonly encountered installation problems. If you require more troubleshooting assistance, see the Operations and Maintenance Instructions. Problem Possible Cause Solution After powering ON the turnstile, the UltraQ No primary power to the Verify power is ON at the circuit breaker.
  • Page 28: Appendix A - Portable Base Turnstile

    UltraQ-AMT Installation Instructions Appendix A - Portable Base Turnstile These supplemental instructions cover installation steps specific to portable base models only. When the installation is complete, proceed to the Post-Installation Inspection section on page 18. Portable Base Plate Illustrated Parts List...
  • Page 29 UltraQ-AMT Installation Instructions Appendix A - Portable Base Turnstile (Cont.) Fig. 35 Fig. 35 1. Remove the turnstile from shipping crate. 2. Use a 9/16" deep socket to remove the two bolts securing the turnstile cabinet to the temporary wood base [Fig.
  • Page 30: Appendix C - Setting The Home Position

    UltraQ-AMT Installation Instructions Appendix C - Setting the Home Position NOTE Power must be on. Fig. 38 Fig. 38 1. Identify the control board attached to the electrical panel in the turnstile cabinet. [Fig. 37]. The (D2) LED will be blinking indicating normaloperation mode.
  • Page 31: Appendix D - Installing Neutrik Connector To Ac Cord

    UltraQ-AMT Installation Instructions Appendix D - Installing Neutrik Connector to AC Cord NOTE Portable Base Turnstile units do not ship with power cables. Instead, each turnstile ships from the factory with a disassembled Neutrik connector. Use the connector to create power cables per your facility’s requirements and specifications.
  • Page 32: Connecting Ac Power To The Portable Turnstile (Ac-Powered Option Only)

    UltraQ-AMT Installation Instructions Installing Neutrik Connector to AC Cord (cont.) W rench size Fasten bushing by means of a fork wrench 7/8” 7/8" (SW22) (SW 22), min. Torque 2.5 Nm (1.8 lb-ft). Torque Value 2.5 Nm FINISH ED p ow erCO N...
  • Page 33: Appendix E - Charging The Portable Turnstile (Battery-Powered Option Only)

    UltraQ-AMT Installation Instructions Appendix E - Charging the Portable Turnstile (Battery-Powered Option Only) Power OFF the turnstile prior to charging the batteries. Fig. 40 Fig. 40 To charge the turnstile [Fig. 40]: 1. Lift charge receptacle cover. 2. Plug the extension cord into the turnstile AC inlet.
  • Page 34: Appendix F - Portable Base Turnstile - Plan, Elevation And Footprint Drawing

    UltraQ-AMT Installation Instructions Appendix F - Portable Base Turnstile - Plan, Elevation and Footprint Drawing Fig. 42 Fig. 42 Fig. 43 Fig. 43 SCREEN Page 34 For Assistance: support@alvaradomfg.com +1 (909) 591-8431 PUD4477 R1.0...
  • Page 35: Revision History

    UltraQ-AMT Installation Instructions Revision History Revision Date Author Description D Bohannon Original document. Page 35 For Assistance: support@alvaradomfg.com +1 (909) 591-8431 PUD4477 R1.0...
  • Page 36 12660 Colony Street, Chino, CA 91710 Telephone: (909) 591-8431 Fax: (909) 628-1403 support@alvaradomfg.com www.alvaradomfg.com © 2020 Alvarado Manufacturing Company, Inc. This work may not be reproduced, published or redistributed, in whole or in part, without the express prior written permission of Alvarado.