Advertisement

Quick Links

This user's guide describes the characteristics, operation, and use of the AMC1100EVM. This evaluation
module (EVM) is an evaluation and development kit for evaluating the AMC1100, a precision isolation
amplifier. A complete circuit description as well as schematic diagram and bill of materials are included.
The following related documents are available through the Texas Instruments web site at www.ti.com.
1
2
3
4
EVM Operation
5
BOM, Schematic, and Layout
1
AMC1100EVM Schematic: Analog Input Section
2
...................................................................................................................
3
4
5
AMC1100 Silkscreen Drawing
1
Related Documentation
2
3
4
5
6
AMC1100EVM Bill of Materials
All trademarks are the property of their respective owners.
SBAU196A - February 2012 - Revised December 2015
Submit Documentation Feedback
Table 1. Related Documentation
Device
AMC1100
SN6501
...............................................................................................................
..............................................................................................................
..............................................................................................................
...............................................................................................................
..............................................................................................
......................................................................................................
.............................................................................................
.....................................................................................................
...........................................................................................................
............................................................................................................
.............................................................................................................
............................................................................................................
...........................................................................................
Copyright © 2012-2015, Texas Instruments Incorporated
SBAU196A - February 2012 - Revised December 2015
AMC1100EVM User's Guide
Literature Number
SBAS562
SLLSEA0
Contents
List of Figures
.......................................................................
.....................................................................
List of Tables
User's Guide
AMC1100EVM User's Guide
2
2
3
4
6
2
3
3
4
6
1
4
4
5
5
7
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AMC1100EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments AMC1100EVM

  • Page 1: Table Of Contents

    SBAU196A – February 2012 – Revised December 2015 AMC1100EVM User's Guide This user's guide describes the characteristics, operation, and use of the AMC1100EVM. This evaluation module (EVM) is an evaluation and development kit for evaluating the AMC1100, a precision isolation amplifier.
  • Page 2: Evm Overview

    AMC1100 devices installed at U1 and U2. Analog Inputs The analog input to the AMC1100EVM printed circuit board (PCB) consists of simple RC filter circuits. Connectors J2 and J5 have identical configurations. An example input circuit for the AMC1100 is shown in...
  • Page 3: Power Supplies

    Analog Output The analog output from the AMC1100EVM board is a fully-differential signal centered at VDD2 / 2. The output is available on the two screw terminals of J4 and J6. The portion for J4 is shown in Figure...
  • Page 4: Vdd2 Input Connector

    This section describes the general operation of the AMC1100EVM. Isolated Power and Analog Inputs: J1, J2, and J5 The isolated power input to the AMC1100EVM PCB can be applied directly to J1, pins 1 and 2. Table 2 lists the details of J1.
  • Page 5: J3: Vdd2 Power

    EVM Operation www.ti.com User Power and Analog Outputs: J3, J4, and J6 The VDD2 power input to the AMC1100EVM PCB can be applied directly to J3, pins 1 and 2. Table 4 lists the details of J3. Table 4. J3: VDD2 Power...
  • Page 6 BOM, Schematic, and Layout www.ti.com BOM, Schematic, and Layout A full-size schematic for the AMC1100EVM board is appended to this user's guide. The bill of materials is provided in Section 5.1. Figure 5 shows the AMC1100 PCB layout. NOTE: Board layout is not to scale. Figures are intended to show how the board is laid out; they are not intended to be used for manufacturing AMC1100EVM PCBs.
  • Page 7 BOM, Schematic, and Layout www.ti.com Bill of Material NOTE: All components should be RoHS compliant. Some part numbers may be either leaded or RoHS. Verify that purchased components are RoHS compliant. Table 6. AMC1100EVM Bill of Materials Item Ref Des Description Manufacturer...
  • Page 8 Changed BOM (Table ........................• Changed schematic NOTE: Page numbers for previous revisions may differ from page numbers in the current version. Revision History SBAU196A – February 2012 – Revised December 2015 Submit Documentation Feedback Copyright © 2012–2015, Texas Instruments Incorporated...
  • Page 9 STANDARD TERMS AND CONDITIONS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, or documentation (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms and conditions set forth herein. Acceptance of the EVM is expressly subject to the following terms and conditions.
  • Page 10 FCC Interference Statement for Class B EVM devices NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation.
  • Page 11 【無線電波を送信する製品の開発キットをお使いになる際の注意事項】 開発キットの中には技術基準適合証明を受けて いないものがあります。 技術適合証明を受けていないもののご使用に際しては、電波法遵守のため、以下のいずれかの 措置を取っていただく必要がありますのでご注意ください。 1. 電波法施行規則第6条第1項第1号に基づく平成18年3月28日総務省告示第173号で定められた電波暗室等の試験設備でご使用 いただく。 2. 実験局の免許を取得後ご使用いただく。 3. 技術基準適合証明を取得後ご使用いただく。 なお、本製品は、上記の「ご使用にあたっての注意」を譲渡先、移転先に通知しない限り、譲渡、移転できないものとします。 上記を遵守頂けない場合は、電波法の罰則が適用される可能性があることをご留意ください。 日本テキサス・イ ンスツルメンツ株式会社 東京都新宿区西新宿6丁目24番1号 西新宿三井ビル 3.3.3 Notice for EVMs for Power Line Communication: Please see http://www.tij.co.jp/lsds/ti_ja/general/eStore/notice_02.page 電力線搬送波通信についての開発キットをお使いになる際の注意事項については、次のところをご覧くださ い。http://www.tij.co.jp/lsds/ti_ja/general/eStore/notice_02.page SPACER EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS.
  • Page 12 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2015, Texas Instruments Incorporated...
  • Page 13 IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, enhancements, improvements and other changes to its semiconductor products and services per JESD46, latest issue, and to discontinue any product or service per JESD48, latest issue.
  • Page 14 Mouser Electronics Authorized Distributor Click to View Pricing, Inventory, Delivery & Lifecycle Information: Texas Instruments AMC1100EVM...

Table of Contents