Advertisement

Quick Links

This user's guide describes the characteristics, operation, and use of the AMC1305EVM populated with
either the AMC1305L25, AMC1305M05 or AMC1305M25. See
analog input range and bandwidth for each component in the AMC1305 family. The AMC1305EVM is
designed for prototyping and evaluation. A complete circuit description, schematic diagram, and bill of
materials are included.
Throughout this document, the abbreviation EVM and the term evaluation module are synonymous with
the AMC1305EVM.
The following related documents are available through the Texas Instruments web site at www.ti.com.
......................................................................................................................
1
2
3
4
5
EVM Set-Up and Operation
6
Bill of Materials, Schematic, and Layout
1
AMC1305EVM Schematic: Analog Input Section
2
3
4
5
6
AMC1305EVM Silk Screen Drawing
1
2
SBAU237 - September 2014
Submit Documentation Feedback
Related Documentation
Device
AMC1305
AMC1210
SN6501
TMS320F28377D
TLV70450
..............................................................................................................
..............................................................................................................
..............................................................................................................
................................................................................................
..................................................................................
List of Figures
.............................................................................
...........................................................................................................
...........................................................................................................
...................................................................................
......................................................................................
..............................................................................................
...........................................................................................
Copyright © 2014, Texas Instruments Incorporated
AMC1305xxEVM User's Guide
Table 1
Literature Number
SBAS654
SBAS372
SLLSEA0
SPRS880A
SBVS148C
Contents
.......................................................................
List of Tables
User's Guide
SBAU237 - September 2014
for additional details about the
AMC1305xxEVM User's Guide
2
2
3
3
7
8
2
3
4
4
6
8
7
9
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AMC1305 EVM Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments AMC1305 EVM Series

  • Page 1: Table Of Contents

    A complete circuit description, schematic diagram, and bill of materials are included. Throughout this document, the abbreviation EVM and the term evaluation module are synonymous with the AMC1305EVM. The following related documents are available through the Texas Instruments web site at www.ti.com. Related Documentation Device Literature Number...
  • Page 2: Overview

    AMC1305 family. All trademarks are the property of their respective owners. AMC1305xxEVM User's Guide SBAU237 – September 2014 Submit Documentation Feedback Copyright © 2014, Texas Instruments Incorporated...
  • Page 3: Digital Interface

    AMC1305 through the two-wire screw terminal at J5; to accomplish that, the user must set jumper JP1 to the position labeled Ext; see Figure SBAU237 – September 2014 AMC1305xxEVM User's Guide Submit Documentation Feedback Copyright © 2014, Texas Instruments Incorporated...
  • Page 4: Jp1 In Ext Position

    U3. To take advantage of this isolated, onboard supply, the user must set jumper JP1 to the position labeled Iso, as shown in Figure Figure 4. JP1 in Iso Position AMC1305xxEVM User's Guide SBAU237 – September 2014 Submit Documentation Feedback Copyright © 2014, Texas Instruments Incorporated...
  • Page 5 200 mV at 8-mA forward current is used in this design. Figure 5 illustrates the forward voltage versus forward current characteristics of the MBR0520L diode. SBAU237 – September 2014 AMC1305xxEVM User's Guide Submit Documentation Feedback Copyright © 2014, Texas Instruments Incorporated...
  • Page 6: Forward Voltage Of The Rectifier Diode

    A linear voltage regulator is included to ensure that a stable supply voltage is delivered to the AMC1305 high side (AVDD pin). The TLV70450 fits this application well because of its low quiescent current and regulation capabilities. AMC1305xxEVM User's Guide SBAU237 – September 2014 Submit Documentation Feedback Copyright © 2014, Texas Instruments Incorporated...
  • Page 7: Amc1305 Family Information

    When the input voltage approaches the lower end of the specified full-scale range (–50 mV or –250 mV, depending on the AMC1305 device type), the ones density of the modulator output approaches 10%. SBAU237 – September 2014 AMC1305xxEVM User's Guide Submit Documentation Feedback Copyright © 2014, Texas Instruments Incorporated...
  • Page 8 Figure 6 shows the PCB layout. Figure 6. AMC1305EVM Silk Screen Drawing Schematic The AMC1305EVM schematic is appended to the end of this document. AMC1305xxEVM User's Guide SBAU237 – September 2014 Submit Documentation Feedback Copyright © 2014, Texas Instruments Incorporated...
  • Page 9: Amc1305Evm Bill Of Materials

    RES, 100, 1%, 0.1 W, 0603. Populated only on EVMs with LVDS Yageo America RC0603FR-07100RL interface. LOW-POWER 150-mA LOW-DROPOUT LINEAR REGULATOR, Texas Instruments TLV70450 DBV0005A SBAU237 – September 2014 AMC1305xxEVM User's Guide Submit Documentation Feedback Copyright © 2014, Texas Instruments Incorporated...
  • Page 10 Not in version control Assembly Variant: AMC1305EVM_M25 Sheet: warrant that this design will meet the specifications, will be suitable for your application or fit for any particular purpose, or will operate in an implementation. Texas Instruments and/or its Drawn By: Jose Duenas File: AMC1305_Main.SchDoc...
  • Page 11 STANDARD TERMS AND CONDITIONS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, or documentation (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms and conditions set forth herein. Acceptance of the EVM is expressly subject to the following terms and conditions.
  • Page 12 FCC Interference Statement for Class B EVM devices NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation.
  • Page 13 【無線電波を送信する製品の開発キットをお使いになる際の注意事項】 本開発キットは技術基準適合証明を受けておりません。 本製品のご使用に際しては、電波法遵守のため、以下のいずれかの措置を取っていただく必要がありますのでご注意ください。 1. 電波法施行規則第6条第1項第1号に基づく平成18年3月28日総務省告示第173号で定められた電波暗室等の試験設備でご使用 いただく。 2. 実験局の免許を取得後ご使用いただく。 3. 技術基準適合証明を取得後ご使用いただく。 なお、本製品は、上記の「ご使用にあたっての注意」を譲渡先、移転先に通知しない限り、譲渡、移転できないものとします。 上記を遵守頂けない場合は、電波法の罰則が適用される可能性があることをご留意ください。 日本テキサス・インスツルメンツ株式会社 東京都新宿区西新宿6丁目24番1号 西新宿三井ビル 3.3.3 Notice for EVMs for Power Line Communication: Please see http://www.tij.co.jp/lsds/ti_ja/general/eStore/notice_02.page 電力線搬送波通信についての開発キットをお使いになる際の注意事項については、次のところをご覧くださ い。http://www.tij.co.jp/lsds/ti_ja/general/eStore/notice_02.page SPACER EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS.
  • Page 14 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2014, Texas Instruments Incorporated...
  • Page 15 IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, enhancements, improvements and other changes to its semiconductor products and services per JESD46, latest issue, and to discontinue any product or service per JESD48, latest issue.
  • Page 16 Mouser Electronics Authorized Distributor Click to View Pricing, Inventory, Delivery & Lifecycle Information: Texas Instruments AMC1305M25EVM AMC1305M05EVM...

This manual is also suitable for:

Amc1305evmAmc1305l25Amc1305m05Amc1305m25

Table of Contents