Advertisement

Quick Links

This user's guide describes the characteristics, operation, and use of the AMC1203EVM. The
AMC1203EVM is designed for prototyping and evaluation. A complete circuit description, schematic
diagram, and bill of materials are included.
The following related documents are available through the Texas Instruments web site at www.ti.com.
1
1.1
1.2
2
2.1
3
4
5
5.1
Isolated Power and Analog Inputs: J1 and J4
5.2
Device Operation
6
BOM, Schematic, and Layout
6.1
Schematic
6.2
Printed Circuit Board Layout
6.3
Bill of Materials
All trademarks are the property of their respective owners.
SBAU170 - August 2010
Device
AMC1203
AMC1210
...................................................................................................
.............................................................................................................
.........................................................................................................
.............................................................................................................
.......................................................................................................
..............................................................................................................
..............................................................................................................
................................................................................................
...................................................................................................
.............................................................................................
...........................................................................................................
......................................................................................
.....................................................................................................
Copyright © 2010, Texas Instruments Incorporated
Literature Number
SBAS427
SBAS372
Contents
..................................................................
User's Guide
SBAU170 - August 2010
AMC1203EVM
AMC1203EVM
2
2
2
2
2
3
4
4
4
5
5
5
5
6
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AMC1203EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments AMC1203EVM

  • Page 1: Table Of Contents

    User's Guide SBAU170 – August 2010 AMC1203EVM This user's guide describes the characteristics, operation, and use of the AMC1203EVM. The AMC1203EVM is designed for prototyping and evaluation. A complete circuit description, schematic diagram, and bill of materials are included. The following related documents are available through the Texas Instruments web site at www.ti.com.
  • Page 2: Amc1203Evm Overview

    The analog input to the AMC1203 is routed from a two-wire screw terminal screw at J4. This screw terminal gives the user access to the inverting and noninverting inputs of the AMC1203. Analog Inputs The analog input to the AMC1203EVM board consists of simple R/C filter circuits. The input circuit for the AMC1203 is shown in Figure...
  • Page 3: Digital Interface

    Digital Interface The AMC1203EVM is designed for use with digital filters such as the AMC1210. The output and power for the AMC1203 are routed to a 9-pin, female D-type connector. Both the analog and digital power for the AMC1203, as well as the modulator data and clock outputs from the device under test, are routed to J2, Figure 2 illustrates.
  • Page 4: Power-Supplies

    This section describes the general operation of the AMC1203EVM. Isolated Power and Analog Inputs: J1 and J4 The isolated power input to the AMC1203EVM printed circuit board (PCB) can be applied directly to J1, pins 1 and 2. Table 2 lists the details of J1.
  • Page 5 Device Operation Once the analog and digital power sources are applied to the AMC1203EVM, the digital outputs become active. The AMC1203 is configured to use its onboard modulator clock. The internal reference of the AMC1203 is used as the conversion reference.
  • Page 6 BOM, Schematic, and Layout www.ti.com Bill of Materials Table 4. AMC1203EVM Bill of Materials Reference Designator Description Manufacturer Mfr Part Number C1, C6 Capacitor, ceramic 0.10 mF 50 V X7R 10% 0603 C1608X7R1H104K C2, C7 Capacitor, ceramic 4.7 mF 25 V X5R 0805...
  • Page 7 GND1 GND2 AMC1203DUB 2MM-3 2MM-3 10pF 10pF Precision Analog HIGH-PERFORMANCE ANALOG DIVISION SEMICONDUCTOR GROUP 12500 TI Blvd, Dallas, TX 75243 TITLE ENGINEER Tom Hendrick AMC1203EVM DRAWN BY Tom Hendrick DOCUMENT CONTROL NO.TBD SIZE DATE 05AUG10 SHEET FILE C:\Userdata\EVMS\AMC1203\AMC1203.ddb - Documents\SCH\AMC1203...
  • Page 8 Evaluation Board/Kit Important Notice Texas Instruments (TI) provides the enclosed product(s) under the following conditions: This evaluation board/kit is intended for use for ENGINEERING DEVELOPMENT, DEMONSTRATION, OR EVALUATION PURPOSES ONLY and is not considered by TI to be a finished end-product fit for general consumer use. Persons handling the product(s) must have electronics training and observe good engineering practice standards.
  • Page 9 IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, modifications, enhancements, improvements, and other changes to its products and services at any time and to discontinue any product or service without notice. Customers should obtain the latest relevant information before placing orders and should verify that such information is current and complete.
  • Page 10 Mouser Electronics Authorized Distributor Click to View Pricing, Inventory, Delivery & Lifecycle Information: Texas Instruments AMC1203EVM...

Table of Contents