Texas Instruments AMC1210EVM User Manual
Texas Instruments AMC1210EVM User Manual

Texas Instruments AMC1210EVM User Manual

Advertisement

Quick Links

1
2
3
1
EVM Overview
The AMC1210 modular evaluation module (EVM) provides four modulator channels from the ADS1204 for
the AMC1210. Two are designated for resolver applications and two are designated for current
measurements. All interface modes of the AMC1210 are provided.
The new modular EVM form factor allows for direct evaluation of the AMC1210's performance and
operating characteristics. This EVM is compatible with the HPA-MCU Interface Board (SLAU106) from
Texas Instruments.
• Four modulator channels provided by ADS1204
• All AMC1210 interface modes available
• Direct operation with a variety of DSK and microcontroller platforms from Texas Instruments
• All four ADS1204 channels have an input range of 0 V to 5 V.
1.1

Analog Interface

The AMC1210 modular EVM is designed for easy interfacing to resolvers and current sensors. Connector
J05 is a 9-pole DSUB jack for easy connection to standard resolvers. To hold the floating resolver inputs
to a predefined common mode level, a 2.5-V voltage is added on the resolver inputs.
Signal
J05.1
J05.2
J05.3
J05.6
J05.7
J05.8
Shield
At the connectors J03 and J04, analog current sensor signals can be connected.
Signal
J03.1, J04.1
J03.2, J04.2
J03.3, J04.3
SLAU185 – August 2006
Submit Documentation Feedback
......................................................................................
......................................................................................
Description
IN1+
Positive sine wave input
IN1–
Negative sine wave input
IN2 +
Positive cosine wave input
PWM1
Positive carrier wave output
PWM2
Negative carrier wave output
IN2–
Negative cosine wave input
PE
Cable shield
Description
IN3+, IN4+
Positive current input signal
PE
Cable shield
IN3–, IN4–
Negative current input signal
Contents
........................................................
User's Guide
SLAU185 – August 2006
AMC1210EVM
1
3
4
AMC1210EVM
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AMC1210EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments AMC1210EVM

  • Page 1 • Four modulator channels provided by ADS1204 • All AMC1210 interface modes available • Direct operation with a variety of DSK and microcontroller platforms from Texas Instruments • All four ADS1204 channels have an input range of 0 V to 5 V.
  • Page 2 AMC1210 modular EVM. The different signals are placed at the same position as the bottom-mounted connectors, see the preceding tables. For higher frequencies on the CLK input of the AMC1210, it could be possible to reduce the value of the series resistor R47. AMC1210EVM SLAU185 – August 2006 Submit Documentation Feedback...
  • Page 3 ADS1204 inputs. Jumper Description JP02, JP03, JP12, JP13, JP04, JP05 JP14, JP15 1-2 Closed Closed The current sensor signal is buffered. (Factory default condition) 2-3 Closed Open The current sensor signal is unbuffered. SLAU185 – August 2006 AMC1210EVM Submit Documentation Feedback...
  • Page 4 The resistor R55 has to be soldered in to reduce the reference voltage for the current sensor channels. AMC1210 Modular EVM Bill of Materials The following table contains a complete bill of materials for the AMC1210EVM. Designators Description Manufacturer Mfg.
  • Page 5 AMC1210 Modular EVM Bill of Materials Designators Description Manufacturer Mfg. Part Number 511 Ω, 1206, 0.125 W, 1% Vishay/Dale CRCW12065110F AMC1210 Texas Instruments AMC1210RHA ADS1204 Texas Instruments ADS1204I OPA4354 Texas Instruments OPA4354U OPA2347 Texas Instruments OPA2347UA U05-U07 SN74LVC2G157 Texas Instruments...
  • Page 7 EVALUATION BOARD/KIT IMPORTANT NOTICE Texas Instruments (TI) provides the enclosed product(s) under the following conditions: This evaluation board/kit is intended for use for ENGINEERING DEVELOPMENT, DEMONSTRATION, OR EVALUATION PURPOSES ONLY and is not considered by TI to be a finished end-product fit for general consumer use. Persons handling the product(s) must have electronics training and observe good engineering practice standards.
  • Page 8 TI as compliant with ISO/TS 16949 requirements. Buyers acknowledge and agree that, if they use any non-designated products in automotive applications, TI will not be responsible for any failure to meet such requirements. Following are URLs where you can obtain information on other Texas Instruments products and application solutions: Products...

Table of Contents