This user's guide describes the characteristics, operation, and the use of the AMC7823
evaluation module. It covers all pertinent areas involved to properly use this EVM board
along with the devices that it supports. The physical PCB layout, schematic diagram,
and circuit descriptions are included.
1
2
3
4
1
2
3
4
5
6
7
8
9
10
1
2
3
1
EVM Overview
This chapter gives a general overview of the AMC7823 evaluation module (EVM) and describes some of
the factors that must be considered in using this module.
1.1
Features
This EVM features the AMC7823 analog monitoring and control circuit device. The AMC7823 EVM is a
simple evaluation module designed for a quick and easy way to evaluate the functionality and
performance of the 12-bit resolution AMC device. The built-in ADC features an eight-channel analog input
with 200 ksps sample rate. The AMC7823 also consists of eight independent 12-bit resolution DACs with
2-µs settling times. Although the AMC7823 has a built-in internal band-gap reference that is software
selectable between 1.25 V and 2.5 V, an external reference source is provided. The internal 1.25-V
reference voltage is the default reference on power up, so the reference voltage should be set to the
desired source and level, if necessary.
SPI is a trademark of Motorola, Inc..
SLAU171 - November 2005
......................................................................................
.........................................................................................
......................................................................................
List of Figures
................................................................................
......................................................................................
..........................................................................
......................................................................
..................................................................................
.........................................................................................
................................................................
...................................................................
List of Tables
.............................................................................................
.................................................................
.................................................................
AMC7823 Evaluation Module
Contents
............................................
............................................................
.............................................................
User's Guide
SLAU171 - November 2005
1
4
9
14
3
4
5
5
6
6
7
8
10
11
8
9
11
AMC7823 Evaluation Module
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AMC7823 EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments AMC7823 EVM

  • Page 1: Table Of Contents

    Features This EVM features the AMC7823 analog monitoring and control circuit device. The AMC7823 EVM is a simple evaluation module designed for a quick and easy way to evaluate the functionality and performance of the 12-bit resolution AMC device.
  • Page 2: Evm Overview

    1.2.1 Supply Voltage The dc analog power supply requirement for the AMC7823 EVM (AV ) is selectable between +3.3 VA and +5 VA via jumper headers, W3. The +3.3 VA comes from J6-8 or J11-1 (if installed), and the +5 VA comes from the J6-3 or J11-3 (if installed) terminals.
  • Page 3: Evm Block Diagram

    The headers J2 (top side) and P2 (bottom side) are pass through connectors provided for the control signals and data required to interface a host processor to the AMC7823 EVM using a custom built cable. The GPIO and alarm pins of the AMC7823 are also mapped to the J2 and J4 headers.
  • Page 4: Pcb Design

    The AMC7823 EVM board is constructed on a four-layer printed circuit board using a copper-clad FR-4 laminate material. The printed circuit board has dimensions of 93,9800 mm (3.7000 inch) × 81,2800 mm (3.200 inch), and the board thickness is 1,5748 mm (0.0620 inch).
  • Page 5: Top Layer (Signal Plane)

    www.ti.com PCB Design Figure 3. Top Layer (Signal Plane) Figure 4. Internal Layer 1 (Split Ground Plane) SLAU171 – November 2005 AMC7823 Evaluation Module...
  • Page 6: Internal Layer 2 (Split Power Plane)

    www.ti.com PCB Design Figure 5. Internal Layer 2 (Split Power Plane) Figure 6. Bottom Layer (Signal Plane) AMC7823 Evaluation Module SLAU171 – November 2005...
  • Page 7: Bottom Silkscreen

    www.ti.com PCB Design Figure 7. Bottom Silkscreen SLAU171 – November 2005 AMC7823 Evaluation Module...
  • Page 8: Drill Drawing

    www.ti.com PCB Design Figure 8. Drill Drawing Bill of Materials Table 1. Parts List Item Qty. Designators Description Manufacturer Mfg. Part Number C1, C3, C6, C8, C17, 0.1 µF C1608X7R1E104KT C18, C19, C21 C9, C10, C11, C12, 150 pF C1608COG1H151J C13, C14, C15, C16 0.47 µF C2, C20...
  • Page 9: Evm Operation

    SSW-110-22-S-D-VS-P 10-PIN Isolated power socket, Samtec SSW-105-22-F-D-VS-K 0.100 TP1, TP2, TP4 Turret terminal pin Mill-Max 2348-2-01-00-00-07-0 QFN-40 (RTA), 12-bit analog Texas Instruments AMC7823IRTA monitoring and control circuit U2, U3 Single buffer/driver Texas Instruments SN74LVC1G07DBVR 64-Kbit EEPROM Microchip Technology 24LC64-I/ST REF1 1.25-V Reference...
  • Page 10: Factory Default Jumper Settings

    Figure 9. Factory Default Jumper Settings Host Processor Interface As noted in chapter 1 of this manual, the AMC7823 EVM is compatible with the 5-6k interface board (SLAU104) from Texas Instruments, as well as the HPA449 demonstration board from SoftBaugh, Inc.
  • Page 11: Digital Serial Interface Pinout

    www.ti.com EVM Operation ELDAC GPIO 0_A SCLK DGND BCLK DGND CLKR GPIO1_B GPIO 1_A GPIO2_B LRCLK GPIO 2_A DGND DGND MOSI GALR MISO RESET TOUT DGND DGND GPIO5_A Figure 10. Digital Serial Interface Pinout The analog signals can be applied directly to the J1T header connector, either single-ended or differentially.
  • Page 12 www.ti.com EVM Operation Table 3. Jumper Settings and Functions (continued) Reference Jumper Setting Function +5-V analog supply is selected for DUT IOV +3.3-V analog supply is selected for DUT IOV +5-V analog supply is selected for DUT AV +3.3-V analog supply is selected for DUT AV +5-V digital supply is selected for DUT DV +3.3-V digital supply is selected for DUT DV Signal ground is not connected to analog ground.
  • Page 13 www.ti.com EVM Operation Table 3. Jumper Settings and Functions (continued) Reference Jumper Setting Function The EEPROM, U4, address is set to 010b. This is only used with a PC graphical user interface application program. See section 3.3. The EEPROM, U4, address is set to 000b. This is only used with a PC graphical user interface application program.
  • Page 14 +5VD +3.3VD AVDD DVDD Note: DNP = Do Not Populate GREEN GREEN SML-LX1206SUGC-TR SML-LX1206SUGC-TR 12500 TI Boulevard. Dallas, Texas 75243 Title: AMC7823 EVM Engineer: J. PARGUIAN DOCUMENTCONTROL # 6468332 REV: Drawn By: FILE: DATE: SIZE: 19-Aug-2005 SHEET: AMC7823 Rev A.Sch...
  • Page 15: Related Documentation From Texas Instruments

    Related Documentation From Texas Instruments Related Documentation From Texas Instruments To obtain a copy of any of the following TI documents, call the Texas Instruments Literature Response Center at (800) 477-8924 or the Product Information Center (PIC) at (972) 644-5580. When ordering, identify this manual by its title and literature number.
  • Page 16 EVM TERMS AND CONDITIONS Texas Instruments (TI) provides the enclosed Evaluation Module and related material (EVM) to you, the user, (you or user) SUBJECT TO the terms and conditions set forth below. By accepting and using the EVM, you are indicating that you have read, understand and agree to be bound by these terms and conditions.
  • Page 17 EVM schematic located in the EVM User's Guide. When placing measurement probes near these devices during operation, please be aware that these devices may be very warm to the touch. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2005, Texas Instruments Incorporated AMC7823 Evaluation Module SLAU171 –...
  • Page 18 TI product or service and is an unfair and deceptive business practice. TI is not responsible or liable for any such statements. Following are URLs where you can obtain information on other Texas Instruments products and application solutions:...
  • Page 19 Mouser Electronics Authorized Distributor Click to View Pricing, Inventory, Delivery & Lifecycle Information: Texas Instruments AMC7823EVM...

Table of Contents