Installation & Commissioning Report - IBC EBX Series Installation And Operation Manual

Residential electric boiler
Table of Contents

Advertisement

Installation & Commissioning Report
Model Number _____________________ Serial Number _______________________________
_
Date of Installation ________ Address of installation ___________________________________
_
User contact information _________________________________________________________
_
Installer Information (Company & Address)___________________________________________
__
Phone/Fax/E-mail ______________________________________________________________
__
Circuit Breaker # ____ Labeled?
Power supply wire gauge _____
Leak testing completed
System Cleaned and Flushed (type of cleaner used) _________________________________
_
System Filled (type/concentration of any glycol/chemicals used) _______________________
__
Air purge completed
Relief Valve correctly installed and piped Relief valve "try lever" test performed
Owner advised and instructed in the safe operation and maintenance of the boiler and system.
Information regarding the appliance and installation received and left with owner
Commissioning has been completed as listed on this report - Installer's Signature _____________
Section: Boiler parts diagram - EBX-series Boiler
66

Advertisement

Table of Contents
loading

Table of Contents