Post-Install
Setup
The Pro 710i is designed with advanced internal programming, which allows it to
automatically adjust for a variety of conditions, while still amplifying weak signals.
Once the antenna cables are connected, turn the unit ON by inserting and twisting the
power supply cord until it is securely locked in place.
power supply
with locking feature
PRO 710i INDUSTRIAL-CLASS, IN-BUILDING CELL SIGNAL AMPLIFIER
BU-GDE000257-001-060820.indd 5
BU-GDE000257-001-060820.indd 5
hand tighten ONLY
Inside Antenna
Outside Antenna
slot for installer
business card
5
6/8/2020 4:33:12 PM
6/8/2020 4:33:12 PM